This is a bilingual snapshot page saved by the user at 2025-4-15 17:59 for https://app.immersivetranslate.com/word/, provided with bilingual support by Immersive Translate. Learn how to save?


Table of Contents

1 技术参数3
1 Technical parameters 3

2 接口4
2 Interface 4

3 原理图6
3 Schematic 6

4 阀门结构7
4 Valve structure 7

5 操作说明7
5 Operating Instructions 7

5.1 与气瓶安装7
5.1 Installation with gas cylinders7

5.2 管路接头安装8
5.2 Pipeline joint installation 8

5.3 管路保压操作8
5.3 Pipeline pressure holding operation8

5.4 气瓶气体置换9
5.4 Gas cylinder gas replacement9

附表1 温度传感器分度表10
Schedule 1 Temperature sensor indexing table 10

。技术参数
。 Technical parameters

序号
serial number

参数名称
The name of the parameter

CQZF-35-24-I

备注
remark

1

使用介质
Use media

氢气(ISO14687)、高纯氮气、氦气,洁净气体,颗粒度<10μm
Hydrogen (ISO14687), high-purity nitrogen, helium, clean gas, particle size < 10μm

2

额定工作压力
Rated working pressure

35MPa@15℃

3

最大工作压力
Maximum operating pressure

43.8MPa

4

温度范围
Temperature range

-40℃~85℃

5

TPRD激活温度
TPRD activation temperature

110℃±5℃

6

阀体材料
Body material

6061-T6051

7

线圈
coil

不分正负极,直流驱动24VDC/12VDC,不同电压线圈,电阻不同。
Regardless of positive and negative poles, DC drive 24VDC/12VDC, different voltage coils, different resistances.

24VDC,线圈电阻48Ω±4Ω
24VDC, coil resistance 48Ω±4Ω

12VDC,线圈电阻14±2Ω
12VDC, coil resistance 14±2Ω

8

线圈防护等级
Coil protection rating

IP65/Exmb IIC T4 Gb/Ex mD 21 T130℃

9

温度传感器
Temperature sensor

类型:NTC,温度分度表见附表
Type: NTC, see the attached table for the temperature indexing table

输入电压5V
The input voltage is 5V

10kΩ@25℃

10

溢流阀关闭压力
Relief valve closing pressure

11

最大工作流量
Maximum operating flow

1500NLPM,若流量超过该值将可能引发溢流阀启动
1500 NLPM, if the flow rate exceeds this value, the relief valve may be activated

12

阀门全开通径
The valve is fully open

4mm

接口
interface

位置
location

阀门端
Valve end

客户端
client

瓶口螺纹
Bottle finish threads

2’’-12UN-2A 配O型圈
2''-12UN-2A with O-rings

2’’-12UN-2B

安装力矩330N.m-370N.m
Installation torque 330N.m-370N.m

进气口/出气口
Air intake/outlet

9/16’’-18-UNF-2B

9/16’’-18-UNF-2A+密封圈
9/16''-18-UNF-2A+ seal

推荐安装力矩40-45N.m
The recommended installation torque is 40-45N.m

压力传感器接口
Pressure sensor interface

7/16’’-20-UNF-2B

7/16’’-20-UNF-2A+密封圈
7/16''-20-UNF-2A+ seal

推荐安装力矩40-45N.m
The recommended installation torque is 40-45N.m

TPRD泄放接口
TPRD bleeder interface

9/16’’-18-UNF-2B

9/16’’-18-UNF-2A+密封圈
9/16''-18-UNF-2A+ seal

推荐安装力矩30-35N.m
The recommended installation torque is 30-35N.m

手动截止阀
Manual shut-off valves

常开
Normally open

对边6mm内六角扳手
6mm Allen wrench on the opposite side

关闭力矩4-6N.m
Closing torque 4-6N.m

排放阀
Drain valves

常闭
Normally closed

对边6mm内六角扳手
6mm Allen wrench on the opposite side

关闭力矩4-6N.m
Closing torque 4-6N.m

电磁阀线圈接插件
Solenoid valve coil connector

(若需要防爆功能可接三线)
(If explosion-proof function is required, it can be connected to three wires)

AMP:282104-1

Pin1:电磁阀驱动+
Pin1: Solenoid valve actuation+

Pin2:电磁阀驱动-
Pin2: Solenoid Valve Actuation-

AMP:282080-1

Pin1:电磁阀驱动+
Pin1: Solenoid valve actuation+

Pin2:电磁阀驱动-
Pin2: Solenoid Valve Actuation-

温度传感器接插件
Temperature sensor connectors

AMP:282080-1

Pin1:温传+
Pin1: Warm Transmission+

Pin2:温传-
Pin2: Wen Chuan-

AMP:282104-1

Pin1:温传+
Pin1: Warm Transmission+

Pin2:温传-
Pin2: Wen Chuan-

原理图
Schematic

注意:1)压力传感器测量的压力为高压管路压力,当电磁阀6打开时方可测量到气瓶内的压力;
Note: 1) the pressure measured by the pressure sensor is the pressure of the high-pressure pipeline, and the pressure in the gas cylinder can be measured when the solenoid valve 6 is opened;

排放阀打开,将会连通气瓶与高压管路;
When the drain valve is opened, the cylinder will be connected to the high-pressure line;

若气瓶与管路之间存在压差,将导致溢流阀启动,管路填充速度将非常缓慢。
If there is a pressure difference between the cylinder and the line, it will cause the relief valve to activate and the line will fill very slowly.

两个出口为连通状态,可作为三通使用。
The two exits are connected and can be used as tees.

阀门结构
Valve structure

操作说明
Instructions

与气瓶安装
Installed with gas cylinders

固定气瓶后,采用下图所示专用工装进行安装,六角对边24接套筒扳手,用于轴向拧紧。长臂用于径向拧紧,长臂可伸入力矩扳手套筒。
After fixing the gas cylinder, the special tooling shown in the figure below is used for installation, and the hexagonal side 24 socket wrenches are used for axial tightening. The long arm is used for radial tightening, and the long arm can reach into the barrel of the torque wrench.

拧紧力矩330N.m~370N.m
Tightening torque 330N.m~370N.m

管路接头安装
Pipe fitting installation

按接口螺纹、管路连接方式匹配相应的转接头和密封圈,管路接头安装力矩按推荐力矩要求执行。
According to the interface thread and pipeline connection mode, match the corresponding adapter and sealing ring, and the installation torque of the pipeline joint shall be implemented according to the recommended torque requirements.

注意:管路接头应干净无毛刺,与O型圈接触的面光洁度要求应高于1.6,安装过程中应确保环境干净无粉尘;在未接入管路系统前,应保证瓶阀各个对外接口有防尘堵帽封堵。
Note: The pipeline joint should be clean and burr-free, the surface finish in contact with the O-ring should be higher than 1.6, and the environment should be clean and dust-free during the installation process.

管路保压操作
Pipeline pressure holding operation

在氢系统集成完成后,需对管路进行气密性检查,为了提高效率,此次检查一般不检查气瓶与瓶阀之间的气密性。
After the integration of the hydrogen system is completed, the air tightness of the pipeline needs to be checked, and in order to improve efficiency, the air tightness between the cylinder and the cylinder valve is generally not checked in this inspection.

在进行管路保压时,将对瓶阀的8手动截止阀进行操作,手动截止阀的位置如下图所示,阀门开关符合传统开关方向,面朝操作口,顺时针关、逆时针开。开启手动阀时,碰到阻挡就停止旋转,避免将弹性挡圈挤出。
When the pipeline is pressurized, the 8 manual shut-off valves of the bottle valve will be operated, and the position of the manual shut-off valve is shown in the figure below, and the valve switch conforms to the traditional switch direction, facing the operation port, and is closed clockwise and opened counterclockwise. When the manual valve is opened, it stops rotating when it hits a block, avoiding the extrusion of the retaining ring.

完成管路保压后,需将手动截止阀设置到开启状态!
After the pressure of the pipeline is completed, the manual shut-off valve needs to be set to the open state!

气瓶气体置换
Gas cylinder gas replacement

在进行氢气置换或者其他气体置换气瓶内气体时,可开启排放阀5,连通气瓶内部和管路系统,从关闭状态逆时针旋转1~1.5圈即可。
When carrying out hydrogen replacement or other gas displacement gas cylinder gas, can open the discharge valve 5, connect the inside of the gas cylinder and the pipeline system, and rotate 1~1.5 times counterclockwise from the closed state.

气体置换工作完成后,切记采用力矩扳手将排放阀5关闭。操作力矩4-6N.m即可。
After the gas replacement work is completed, remember to use a torque wrench to close the discharge valve 5. The operating torque is 4-6N.m.

附表1 温度传感器分度表