日期 船名 IMO 號 全長 (米) 寬 (米) 深 (米) 總噸位 (噸) 淨噸位 (噸) 裝載噸位 (噸)
Date
Ship name
IMO No
LOA (m)
B (m)
D (m)
GRT (tons)
NRT (tons)
DWT (tons)
Date Ship name IMO No LOA (m) B (m) D (m) GRT (tons) NRT (tons) DWT (tons)| Date | | :--- | | Ship name | | IMO No | | LOA (m) | | B (m) | | D (m) | | GRT (tons) | | NRT (tons) | | DWT (tons) |
No  Description 描述 Unit 單位 Qty 數量
USD $
U. Price
USD $ U. Price| USD $ | | :--- | | U. Price |
 美元 $ 總計
USD $
Total
USD $ Total| USD $ | | :--- | | Total |
1 GENERAL SERVICES 一般服務
1.1 Docking & Undocking 對接與脫離
1.1.1 Docking/Undocking and first day
對接/脫離和第一天
pcs 1 2,500.00
1.1.2 The other days in dry dock
在乾船塭的其他日子
day  1 1,500.00
1.1.3 Mooring/unmooring 系泊/解系 time 時間 1 1,000.00
1.2 Pilotage & Tugboat 引航與拖船
1.2.1 Services to be arranged by owner's agent on owner's account
由業主代理人按業主的賬戶安排的服務
agent 代理人
1.3 Gas Free Inspection 無氣檢查
1.3.1 Gas free inspection and report by an authorised chemist
由授權化學家進行的無氣體檢查和報告
visit 訪問 1 250.00
Note 注意 Daily gas free inspection of the locations involved shipyard
每日免費檢查相關船廠的氣體情況
1.4 Fire Precautions (compulsory)
火災預防措施(強制)
1.4.1 Line Connection/Disconnection
線路連接/斷開
pcs 1 150.00
1.4.2 Provide firefighting water to
提供滅火用水給
day  1 100.00
1.4.3 Fire watchman (per man per 8 hours shift)
消防看守(每人每 8 小時班次)
day  1 100.00
1.5 Cooling Water Supply 冷卻水供應
1.5.1 Line Connection/Disconnection
線路連接/斷開
pCs 1 100.00
1.5.2 Water supply 供水 day  1 50.00
1.6 Ballast Water Supply 壓艙水供應
1.6.1 Connection/Disconnection 連接/斷開連接 pcs 100.00
16.2 Sea water supply 海水供應 tons  1.00
1.7 Sewage Connection (compulsory in drydock)
污水連接(在乾船塭內為必須)
1.7.1 Sewage Connection/disconnection
污水連接/斷開
line  1 100.00
1.7 .2 Provide connection from vessel to the sewage tank of dock
提供船舶與碼頭污水槽的連接
day  1 50.00
1.8 Drain Scupper Installation
排水口安裝
pcs 1 30.00
1.9 Cranage for owners usage - min. 1 hour -
業主使用的起重機 - 最少 1 小時 -
hour 小時 1 120.00
1.10 Gangway Ladder Installation (compulsory)
舷梯安裝(必須)
pcs 1 150.00
1.11 Cleaning Oily place - chemical,detergant owner supply -
清潔油膩地方 - 化學品,清潔劑擁有者供應 -
sqm 1 4.00
1.12 Fresh water supply 淡水供應 tons  1 7.00
1.13 Manholes 人孔
1.13.1 Open/Close ( If cement covered on manhole to be charged extra )
開/關(如果人孔蓋上有水泥,將收取額外費用)
pcs 1 60.00
1.13 .2 Renewal stud/nut and washer by recondition teeth place
更新螺柱/螺母和墊圈,通過重新修整齒輪位置
pcs 1 10.00
1.13 .3 Renewal of gaskets 密封墊的更換 pcs 1 20.00
1.14 Wharfage 碼頭費用
1.14.1 A safe berth fee if owner required
如果業主要求,安全停泊費用
day  1 700.00
1.14.2 A safe berth fee if works to be carried out by ship yard
如果由船廠進行作業,則安全停泊費用
day  1 free 免費
1.15 Drydock blocks removal 乾船塭塊移除
1.15.1 Keel blocks removal if needed for access to steel work
如有需要以便進行鋼材作業,移除龍骨塊
pcs 1 250.00
1.15 .2 Side blocks removal if needed for access to steel work
如有需要,移除側塊以便進入鋼結構工作
pcs 1 400.00
1.16 Bottom plugs 底塞
1.16 .1 Open / Close of bottom plugs including new packing
打開/關閉底部塞子,包括新的填料
pcs 1 30.00
1.16 .2 Renewal of bottom plugs- material include
底塞的更換 - 材料包括
pcs 1 300.00
1.16 .3 Vacuum test - per plug
真空測試 - 每個插頭
pcs 1 50.00
1.17 Compressed Air Supply(6-8 kg/ cm 2 2 ^(2){ }^{2} ) for owners usage
壓縮空氣供應(6-8 kg/ cm 2 2 ^(2){ }^{2} )供業主使用
hour 小時 1 20.00
"Date Ship name IMO No LOA (m) B (m) D (m) GRT (tons) NRT (tons) DWT (tons)" No Description Unit Qty "USD $ U. Price" "USD $ Total" 1 GENERAL SERVICES 1.1 Docking & Undocking 1.1.1 Docking/Undocking and first day pcs 1 2,500.00 1.1.2 The other days in dry dock day 1 1,500.00 1.1.3 Mooring/unmooring time 1 1,000.00 1.2 Pilotage & Tugboat 1.2.1 Services to be arranged by owner's agent on owner's account agent 1.3 Gas Free Inspection 1.3.1 Gas free inspection and report by an authorised chemist visit 1 250.00 Note Daily gas free inspection of the locations involved shipyard 1.4 Fire Precautions (compulsory) 1.4.1 Line Connection/Disconnection pcs 1 150.00 1.4.2 Provide firefighting water to day 1 100.00 1.4.3 Fire watchman (per man per 8 hours shift) day 1 100.00 1.5 Cooling Water Supply 1.5.1 Line Connection/Disconnection pCs 1 100.00 1.5.2 Water supply day 1 50.00 1.6 Ballast Water Supply 1.6.1 Connection/Disconnection pcs 100.00 16.2 Sea water supply tons 1.00 1.7 Sewage Connection (compulsory in drydock) 1.7.1 Sewage Connection/disconnection line 1 100.00 1.7 .2 Provide connection from vessel to the sewage tank of dock day 1 50.00 1.8 Drain Scupper Installation pcs 1 30.00 1.9 Cranage for owners usage - min. 1 hour - hour 1 120.00 1.10 Gangway Ladder Installation (compulsory) pcs 1 150.00 1.11 Cleaning Oily place - chemical,detergant owner supply - sqm 1 4.00 1.12 Fresh water supply tons 1 7.00 1.13 Manholes 1.13.1 Open/Close ( If cement covered on manhole to be charged extra ) pcs 1 60.00 1.13 .2 Renewal stud/nut and washer by recondition teeth place pcs 1 10.00 1.13 .3 Renewal of gaskets pcs 1 20.00 1.14 Wharfage 1.14.1 A safe berth fee if owner required day 1 700.00 1.14.2 A safe berth fee if works to be carried out by ship yard day 1 free 1.15 Drydock blocks removal 1.15.1 Keel blocks removal if needed for access to steel work pcs 1 250.00 1.15 .2 Side blocks removal if needed for access to steel work pcs 1 400.00 1.16 Bottom plugs 1.16 .1 Open / Close of bottom plugs including new packing pcs 1 30.00 1.16 .2 Renewal of bottom plugs- material include pcs 1 300.00 1.16 .3 Vacuum test - per plug pcs 1 50.00 1.17 Compressed Air Supply(6-8 kg/ cm ^(2) ) for owners usage hour 1 20.00 | | Date <br> Ship name <br> IMO No <br> LOA (m) <br> B (m) <br> D (m) <br> GRT (tons) <br> NRT (tons) <br> DWT (tons) | | | | | | :---: | :---: | :---: | :---: | :---: | :---: | | No | Description | Unit | Qty | USD $ <br> U. Price | USD $ <br> Total | | 1 | GENERAL SERVICES | | | | | | 1.1 | Docking & Undocking | | | | | | 1.1.1 | Docking/Undocking and first day | pcs | 1 | 2,500.00 | | | 1.1.2 | The other days in dry dock | day | 1 | 1,500.00 | | | 1.1.3 | Mooring/unmooring | time | 1 | 1,000.00 | | | 1.2 | Pilotage & Tugboat | | | | | | 1.2.1 | Services to be arranged by owner's agent on owner's account | agent | | | | | 1.3 | Gas Free Inspection | | | | | | 1.3.1 | Gas free inspection and report by an authorised chemist | visit | 1 | 250.00 | | | Note | Daily gas free inspection of the locations involved shipyard | | | | | | 1.4 | Fire Precautions (compulsory) | | | | | | 1.4.1 | Line Connection/Disconnection | pcs | 1 | 150.00 | | | 1.4.2 | Provide firefighting water to | day | 1 | 100.00 | | | 1.4.3 | Fire watchman (per man per 8 hours shift) | day | 1 | 100.00 | | | 1.5 | Cooling Water Supply | | | | | | 1.5.1 | Line Connection/Disconnection | pCs | 1 | 100.00 | | | 1.5.2 | Water supply | day | 1 | 50.00 | | | 1.6 | Ballast Water Supply | | | | | | 1.6.1 | Connection/Disconnection | pcs | | 100.00 | | | 16.2 | Sea water supply | tons | | 1.00 | | | 1.7 | Sewage Connection (compulsory in drydock) | | | | | | 1.7.1 | Sewage Connection/disconnection | line | 1 | 100.00 | | | 1.7 .2 | Provide connection from vessel to the sewage tank of dock | day | 1 | 50.00 | | | 1.8 | Drain Scupper Installation | pcs | 1 | 30.00 | | | 1.9 | Cranage for owners usage - min. 1 hour - | hour | 1 | 120.00 | | | 1.10 | Gangway Ladder Installation (compulsory) | pcs | 1 | 150.00 | | | 1.11 | Cleaning Oily place - chemical,detergant owner supply - | sqm | 1 | 4.00 | | | 1.12 | Fresh water supply | tons | 1 | 7.00 | | | 1.13 | Manholes | | | | | | 1.13.1 | Open/Close ( If cement covered on manhole to be charged extra ) | pcs | 1 | 60.00 | | | 1.13 .2 | Renewal stud/nut and washer by recondition teeth place | pcs | 1 | 10.00 | | | 1.13 .3 | Renewal of gaskets | pcs | 1 | 20.00 | | | 1.14 | Wharfage | | | | | | 1.14.1 | A safe berth fee if owner required | day | 1 | 700.00 | | | 1.14.2 | A safe berth fee if works to be carried out by ship yard | day | 1 | free | | | 1.15 | Drydock blocks removal | | | | | | 1.15.1 | Keel blocks removal if needed for access to steel work | pcs | 1 | 250.00 | | | 1.15 .2 | Side blocks removal if needed for access to steel work | pcs | 1 | 400.00 | | | 1.16 | Bottom plugs | | | | | | 1.16 .1 | Open / Close of bottom plugs including new packing | pcs | 1 | 30.00 | | | 1.16 .2 | Renewal of bottom plugs- material include | pcs | 1 | 300.00 | | | 1.16 .3 | Vacuum test - per plug | pcs | 1 | 50.00 | | | 1.17 | Compressed Air Supply(6-8 kg/ cm ${ }^{2}$ ) for owners usage | hour | 1 | 20.00 | |
No  Description 描述 Unit 單位 Qty 數量 U. Price Total 總計
1.18 Shore Electric Power 岸上電力
1.18 .1 Connection / Disconnection of cable
連接 / 斷開電纜
time 時間 1 150.00
1.18 .2 Current (A/C 380 V 50 Hz .)
電流 (A/C 380 V 50 Hz .)
kwh 1 0.30
1.19 Garbage Removal 垃圾清除
1.19 .1 Garbage Disposal Daily 垃圾處理每日 barrel  1 50.00
1.19 .2 Extra garbage disposal if it is necessary
如果有必要,額外的垃圾處理
truck 卡車 1 400.00
1.20 Telephone 電話
10.20 .1 Line Connection / Disconnection
線路連接 / 斷開
pcs 1 50.00
10.20.2 Local Calls / Extention call of shipyard
本地電話 / 船廠的內線電話
day  1 free 免費
1.21 Cherry picker for owners usage (8.30-18.00)
業主使用的高空作業車(8:30-18:00)
hour 小時 1 50.00
1.22 Staging for owners usage 業主使用的佈置
1.22.1 In dry - dock 在乾船塭 cbm 1 8.00
1.22 .2 In Holds 在持有中 cbm 1 9.00
1.22 .3 In Ballast tank 在壓載艙內 cbm 1 10.00
1.23 Ventilation Fans installation & using per unit
通風風扇的安裝與使用每單位
day  1 60.00
1.24 Temporary Lighting for owner s purpose per unit
每個單位的臨時照明以供業主使用
day  1 20.00
2 SURFACE PREPARATION & PAINTING
表面準備與塗裝
a) HPWJ is 500 bar max.it is used dissolve rast from the the surfaces
HPWJ 最大為 500 巴。它用於溶解表面的殘留物。
b) Paints will be supplied by the owner
油漆將由業主提供
c) SA2,SA1, Sweeping area calculated min. 250 m 2 if less then
SA2,SA1,掃描區域計算最小為 250 平方米,如果少於則
d) Staging, crane service and cherry picker usage included in price
價格包含搭建、起重機服務和高空作業車使用
e) Blowing of surfaces after abrasive blasting is included in price
噴砂後的表面吹風已包含在價格內
f) Hand scraping/mechanical cleaning to be charged extra in case it
手工刮除/機械清潔將額外收費
is necessary before/after sand blasting
在沙噴射之前/之後是必要的
g) Price of stripe coat painting will be charged on the rate of full coat
條紋外套繪畫的價格將按全塗層的費率收取
h) Protection of deck machinery and equipment against the defects
對甲板機械和設備缺陷的保護
which may occur during cleaning and painting works will be
在清潔和繪畫工作中可能發生的將是
carried out by vessel. 由船隻執行。
i) Coating of bituminous or zinc epoxy paint will be charged as 25 % 25 % 25%25 \%
瀝青或鋅環氧漆的塗層將收取 25 % 25 % 25%25 \% 費用
addition to rate of full coat painting
全塗裝繪畫的費率附加費
j) In case only washing and painting works will be carrying out, the
如果只進行清洗和粉刷工作,則
price will be revised as per shipyard general terms
價格將根據船廠的一般條款進行修訂
k) For estimating of dry - dock & repair period, it is assumed that
為了估算乾船塭和修理期間,假設
minimum one coat per can be applied
每罐可施加至少一層塗料
I) Chemical cleaning and other surface treatment works will be extra
化學清潔和其他表面處理工作將另行收費
if needed 如果需要
m) Protection of hull anodes, catodic protection unit stern tube and
保護船體陽極,陰極保護單元艉管和
propeller during blasting and painting are included in prices
噴射和塗漆期間的螺旋槳已包含在價格中
n) Surfaces will be calculated by our technicians during the repairs
表面將由我們的技術人員在維修過程中計算
and will be compared with owner's values.
並將與擁有者的價值觀進行比較。
o) Application of special type paints more than 250 micron DFT/coat
特殊類型塗料的應用超過 250 微米的乾膜厚度/塗層
to be charged extra. 需額外收費。
p) Cleaning of dock, residuals etc. are included in prices. Collecting
碼頭清潔、殘留物等已包含在價格中。收集
and disposal of empty paint drums to be shipyard property
及空油漆桶的處理歸船廠所有
r) Cleaning of holds from grit/paint reasiduals are included in prices
清理艙室中的砂礫/油漆殘留物已包含在價格中
2.1 Cleaning&Painting Works on Hull
船體清潔與塗漆工作
Flat Bottom 平底
2.1.1 High Pressure Fresh Water Washing (500 Bar)
高壓淡水清洗(500 巴)
sqm 1 1.10
2.1.2 Fresh Water Washing Down 淡水沖洗 sqm 1 0.50
2.1.3 Hand Scraping 手工刮削 sqm 1 1.00
2.1.4 Grit Sweeping - full sqm 1 9.00
2.1.5 Grit Blasting to SA 1.0 - full sqm 1 10.00
2.1.6 Grit Blasting to SA 2.0 - full sqm 1 12.00
2.1.7 Touch up and full painting for each coat
每層的修補和全面塗裝
sqm 1 0.80
No Description Unit Qty U. Price Total 1.18 Shore Electric Power 1.18 .1 Connection / Disconnection of cable time 1 150.00 1.18 .2 Current (A/C 380 V 50 Hz .) kwh 1 0.30 1.19 Garbage Removal 1.19 .1 Garbage Disposal Daily barrel 1 50.00 1.19 .2 Extra garbage disposal if it is necessary truck 1 400.00 1.20 Telephone 10.20 .1 Line Connection / Disconnection pcs 1 50.00 10.20.2 Local Calls / Extention call of shipyard day 1 free 1.21 Cherry picker for owners usage (8.30-18.00) hour 1 50.00 1.22 Staging for owners usage 1.22.1 In dry - dock cbm 1 8.00 1.22 .2 In Holds cbm 1 9.00 1.22 .3 In Ballast tank cbm 1 10.00 1.23 Ventilation Fans installation & using per unit day 1 60.00 1.24 Temporary Lighting for owner s purpose per unit day 1 20.00 2 SURFACE PREPARATION & PAINTING a) HPWJ is 500 bar max.it is used dissolve rast from the the surfaces b) Paints will be supplied by the owner c) SA2,SA1, Sweeping area calculated min. 250 m 2 if less then d) Staging, crane service and cherry picker usage included in price e) Blowing of surfaces after abrasive blasting is included in price f) Hand scraping/mechanical cleaning to be charged extra in case it is necessary before/after sand blasting g) Price of stripe coat painting will be charged on the rate of full coat h) Protection of deck machinery and equipment against the defects which may occur during cleaning and painting works will be carried out by vessel. i) Coating of bituminous or zinc epoxy paint will be charged as 25% addition to rate of full coat painting j) In case only washing and painting works will be carrying out, the price will be revised as per shipyard general terms k) For estimating of dry - dock & repair period, it is assumed that minimum one coat per can be applied I) Chemical cleaning and other surface treatment works will be extra if needed m) Protection of hull anodes, catodic protection unit stern tube and propeller during blasting and painting are included in prices n) Surfaces will be calculated by our technicians during the repairs and will be compared with owner's values. o) Application of special type paints more than 250 micron DFT/coat to be charged extra. p) Cleaning of dock, residuals etc. are included in prices. Collecting and disposal of empty paint drums to be shipyard property r) Cleaning of holds from grit/paint reasiduals are included in prices 2.1 Cleaning&Painting Works on Hull Flat Bottom 2.1.1 High Pressure Fresh Water Washing (500 Bar) sqm 1 1.10 2.1.2 Fresh Water Washing Down sqm 1 0.50 2.1.3 Hand Scraping sqm 1 1.00 2.1.4 Grit Sweeping - full sqm 1 9.00 2.1.5 Grit Blasting to SA 1.0 - full sqm 1 10.00 2.1.6 Grit Blasting to SA 2.0 - full sqm 1 12.00 2.1.7 Touch up and full painting for each coat sqm 1 0.80 | No | Description | Unit | Qty | U. Price | Total | | :---: | :---: | :---: | :---: | :---: | :---: | | 1.18 | Shore Electric Power | | | | | | 1.18 .1 | Connection / Disconnection of cable | time | 1 | 150.00 | | | 1.18 .2 | Current (A/C 380 V 50 Hz .) | kwh | 1 | 0.30 | | | 1.19 | Garbage Removal | | | | | | 1.19 .1 | Garbage Disposal Daily | barrel | 1 | 50.00 | | | 1.19 .2 | Extra garbage disposal if it is necessary | truck | 1 | 400.00 | | | 1.20 | Telephone | | | | | | 10.20 .1 | Line Connection / Disconnection | pcs | 1 | 50.00 | | | 10.20.2 | Local Calls / Extention call of shipyard | day | 1 | free | | | 1.21 | Cherry picker for owners usage (8.30-18.00) | hour | 1 | 50.00 | | | 1.22 | Staging for owners usage | | | | | | 1.22.1 | In dry - dock | cbm | 1 | 8.00 | | | 1.22 .2 | In Holds | cbm | 1 | 9.00 | | | 1.22 .3 | In Ballast tank | cbm | 1 | 10.00 | | | 1.23 | Ventilation Fans installation & using per unit | day | 1 | 60.00 | | | 1.24 | Temporary Lighting for owner s purpose per unit | day | 1 | 20.00 | | | 2 | SURFACE PREPARATION & PAINTING | | | | | | a) | HPWJ is 500 bar max.it is used dissolve rast from the the surfaces | | | | | | b) | Paints will be supplied by the owner | | | | | | c) | SA2,SA1, Sweeping area calculated min. 250 m 2 if less then | | | | | | d) | Staging, crane service and cherry picker usage included in price | | | | | | e) | Blowing of surfaces after abrasive blasting is included in price | | | | | | f) | Hand scraping/mechanical cleaning to be charged extra in case it | | | | | | | is necessary before/after sand blasting | | | | | | g) | Price of stripe coat painting will be charged on the rate of full coat | | | | | | h) | Protection of deck machinery and equipment against the defects | | | | | | | which may occur during cleaning and painting works will be | | | | | | | carried out by vessel. | | | | | | i) | Coating of bituminous or zinc epoxy paint will be charged as $25 \%$ | | | | | | | addition to rate of full coat painting | | | | | | j) | In case only washing and painting works will be carrying out, the | | | | | | | price will be revised as per shipyard general terms | | | | | | k) | For estimating of dry - dock & repair period, it is assumed that | | | | | | | minimum one coat per can be applied | | | | | | I) | Chemical cleaning and other surface treatment works will be extra | | | | | | | if needed | | | | | | m) | Protection of hull anodes, catodic protection unit stern tube and | | | | | | | propeller during blasting and painting are included in prices | | | | | | n) | Surfaces will be calculated by our technicians during the repairs | | | | | | | and will be compared with owner's values. | | | | | | o) | Application of special type paints more than 250 micron DFT/coat | | | | | | | to be charged extra. | | | | | | p) | Cleaning of dock, residuals etc. are included in prices. Collecting | | | | | | | and disposal of empty paint drums to be shipyard property | | | | | | r) | Cleaning of holds from grit/paint reasiduals are included in prices | | | | | | | | | | | | | 2.1 | Cleaning&Painting Works on Hull | | | | | | | Flat Bottom | | | | | | 2.1.1 | High Pressure Fresh Water Washing (500 Bar) | sqm | 1 | 1.10 | | | 2.1.2 | Fresh Water Washing Down | sqm | 1 | 0.50 | | | 2.1.3 | Hand Scraping | sqm | 1 | 1.00 | | | 2.1.4 | Grit Sweeping - full | sqm | 1 | 9.00 | | | 2.1.5 | Grit Blasting to SA 1.0 - full | sqm | 1 | 10.00 | | | 2.1.6 | Grit Blasting to SA 2.0 - full | sqm | 1 | 12.00 | | | 2.1.7 | Touch up and full painting for each coat | sqm | 1 | 0.80 | |
No  Description 描述 Unit 單位 Qty 數量 U. Price Total 總計
Vertical Bottom 垂直底部
2.1.8 High Pressure Fresh Water Washing (500 Bar)
高壓淡水清洗(500 巴)
sqm 1 1.10
2.1.9 Fresh Water Washing Down 淡水沖洗 sqm 1 0.50
2.1.10 Hand Scraping 手工刮削 sqm 1 1.00
2.1.11 Grit Sweeping - full sqm 1 9.00
2.1.12 Grit Blasting to SA 1.0 - full sqm 1 10.00
2.1.13 Grit Blasting to SA 2.0 - full sqm 1 12.00
2.1.14 Touch up and full painting for each coat
每層的修補和全面塗裝
sqm 1 0.80
Boottop
2.1.15 High Pressure Fresh Water Washing (500 Bar)
高壓淡水清洗(500 巴)
sqm 1 1.10
2.1.16 Fresh Water Washing Down 淡水沖洗 sqm 1 0.50
2.1.17 Hand Scraping 手工刮削 sqm 1 1.00
2.1.18 Grit Sweeping - full sqm 1 9.00
2.1.19 Grit Blasting to SA 1.0 - full sqm 1 10.00
2.1.20 Grit Blasting to SA 2.0 - full sqm 1 12.00
2.1.21 Touch up and full painting for each coat
每層的修補和全面塗裝
sqm 1 0.80
Topside 上方
2.1.22 High Pressure Fresh Water Washing (500 Bar) hpwj
高壓淡水清洗 (500 巴) hpwj
sqm 1 1.10
2.1.23 Hose down washing 用水管沖洗 sqm 1 0.50
2.1.24 Hand Scraping 手工刮削 sqm 1 1.00
2.1.25 Grit Sweeping - full sqm 1 9.00
2.1.26 Grit Blasting to SA 1.0 - full sqm 1 10.00
2.1.27 Grit Blasting to SA 2.0 - full sqm 1 12.00
2.1.28 Touch up and full painting for each coat
每層的修補和全面塗裝
sqm 1 0.80
Cleaning and Painting Works in Holds and hatch covers inside
艙內及艙口蓋的清潔和塗漆工作
2.1.29 High Pressure Fresh Water Washing (500 Bar)
高壓淡水清洗(500 巴)
sqm 1 1.20
2.1.30 Fresh Water Washing Down 淡水沖洗 sqm 1 0.50
2.1.31 Hand Scraping 手工刮削 sqm 1 1.00
2.1.32 Grit Sweeping - full sqm 1 10.00
2.1.33 Grit Blasting to SA 1.0 - full sqm 1 12.00
2.1.34 Grit Blasting to SA 2.0 - full sqm 1 14.00
2.1.35 Touch up and ful painting for each coat
每層塗料的修飾和完整塗裝
sqm 1 1.20
Note 注意 Staging and cherry picker usage is included above prices in case
舞台和高空作業車的使用已包含在上述價格中
it is full blasting & painting.
它正在全力噴砂和塗漆。
2.1.36 If spot blasting up to %50 staging will be added each Hold
如果每個貨艙將增加高達 50%的點噴射階段
hold 持有 1 1,000.00
2.2 Hull Marking 船體標記
2.2.1 Repainting of draft marks & Plimsoll's marks,tug,truster figures
重繪草圖標記和普林索爾標記、拖船、推進器數字
set 設置 1 700.00
2.2.2 Repainting of vessel's name (port, straboard and aft)
重新粉刷船名(艙口、右舷和船尾)
set 設置 1 800.00
2.2.3 Boottop line m 1 3.00
3 TANK CLEANING & DISPOSAL 罐清洗與處理
3.1 Ballast tank cleaning -hummering scraping heavy rust,collecting mud
壓艙水艙清潔 - 錘擊刮除重銹,收集泥土
cbm I 10.00
3.2 Removal and disposal of mud to authorised shore facility
將泥土移除並處置至授權的岸上設施
ton  1 150.00
3.3 F.O. tank cleaning for inspection -calculated min. 50 cbm-
F.O. 油箱清洗以便檢查 - 計算最小 50 立方米 -
cbm 1 25.00
3.4 D.O. tank cleaning for inspection -calculated min. 50 cbm-
D.O. 油槽清洗以便檢查 - 計算最小 50 立方米 -
cbm 1 20.00
3.5 Removal and disposal of sludge to authorised shore facility
將污泥移除並處置至授權的岸上設施
ton  1 250.00
3.6 Bilge water disposal 污水處理 ton  1 70.00
3.7 Pumping of oily bilge water by shipyard pump
船廠泵抽取油性艙水
cbm 1 20.00
4 RUDDER,TAILSHAFT, PROPELLER AND WORKS
舵、尾軸、螺旋槳及其相關設備
4.1 Rudder 
41.1 Measurement of rudder pintle clearences
舵柄間隙的測量
pcs 1 200.00
41.2 Remove access cover plates and check upper and lower pintle
移除接入蓋板並檢查上部和下部銷釘
pcs 1 400.00
41.3 Rudder blade dismantling and refitting
舵葉拆卸和重新安裝
pcs 1 3,000.00
41.4 Rudder stock dismantling and refitting from steering gear
舵柄拆卸和重新安裝自舵機
pcs 1 3,500.00
No Description Unit Qty U. Price Total Vertical Bottom 2.1.8 High Pressure Fresh Water Washing (500 Bar) sqm 1 1.10 2.1.9 Fresh Water Washing Down sqm 1 0.50 2.1.10 Hand Scraping sqm 1 1.00 2.1.11 Grit Sweeping - full sqm 1 9.00 2.1.12 Grit Blasting to SA 1.0 - full sqm 1 10.00 2.1.13 Grit Blasting to SA 2.0 - full sqm 1 12.00 2.1.14 Touch up and full painting for each coat sqm 1 0.80 Boottop 2.1.15 High Pressure Fresh Water Washing (500 Bar) sqm 1 1.10 2.1.16 Fresh Water Washing Down sqm 1 0.50 2.1.17 Hand Scraping sqm 1 1.00 2.1.18 Grit Sweeping - full sqm 1 9.00 2.1.19 Grit Blasting to SA 1.0 - full sqm 1 10.00 2.1.20 Grit Blasting to SA 2.0 - full sqm 1 12.00 2.1.21 Touch up and full painting for each coat sqm 1 0.80 Topside 2.1.22 High Pressure Fresh Water Washing (500 Bar) hpwj sqm 1 1.10 2.1.23 Hose down washing sqm 1 0.50 2.1.24 Hand Scraping sqm 1 1.00 2.1.25 Grit Sweeping - full sqm 1 9.00 2.1.26 Grit Blasting to SA 1.0 - full sqm 1 10.00 2.1.27 Grit Blasting to SA 2.0 - full sqm 1 12.00 2.1.28 Touch up and full painting for each coat sqm 1 0.80 Cleaning and Painting Works in Holds and hatch covers inside 2.1.29 High Pressure Fresh Water Washing (500 Bar) sqm 1 1.20 2.1.30 Fresh Water Washing Down sqm 1 0.50 2.1.31 Hand Scraping sqm 1 1.00 2.1.32 Grit Sweeping - full sqm 1 10.00 2.1.33 Grit Blasting to SA 1.0 - full sqm 1 12.00 2.1.34 Grit Blasting to SA 2.0 - full sqm 1 14.00 2.1.35 Touch up and ful painting for each coat sqm 1 1.20 Note Staging and cherry picker usage is included above prices in case it is full blasting & painting. 2.1.36 If spot blasting up to %50 staging will be added each Hold hold 1 1,000.00 2.2 Hull Marking 2.2.1 Repainting of draft marks & Plimsoll's marks,tug,truster figures set 1 700.00 2.2.2 Repainting of vessel's name (port, straboard and aft) set 1 800.00 2.2.3 Boottop line m 1 3.00 3 TANK CLEANING & DISPOSAL 3.1 Ballast tank cleaning -hummering scraping heavy rust,collecting mud cbm I 10.00 3.2 Removal and disposal of mud to authorised shore facility ton 1 150.00 3.3 F.O. tank cleaning for inspection -calculated min. 50 cbm- cbm 1 25.00 3.4 D.O. tank cleaning for inspection -calculated min. 50 cbm- cbm 1 20.00 3.5 Removal and disposal of sludge to authorised shore facility ton 1 250.00 3.6 Bilge water disposal ton 1 70.00 3.7 Pumping of oily bilge water by shipyard pump cbm 1 20.00 4 RUDDER,TAILSHAFT, PROPELLER AND WORKS 4.1 Rudder 41.1 Measurement of rudder pintle clearences pcs 1 200.00 41.2 Remove access cover plates and check upper and lower pintle pcs 1 400.00 41.3 Rudder blade dismantling and refitting pcs 1 3,000.00 41.4 Rudder stock dismantling and refitting from steering gear pcs 1 3,500.00 | No | Description | Unit | Qty | U. Price | Total | | :---: | :---: | :---: | :---: | :---: | :---: | | | Vertical Bottom | | | | | | 2.1.8 | High Pressure Fresh Water Washing (500 Bar) | sqm | 1 | 1.10 | | | 2.1.9 | Fresh Water Washing Down | sqm | 1 | 0.50 | | | 2.1.10 | Hand Scraping | sqm | 1 | 1.00 | | | 2.1.11 | Grit Sweeping - full | sqm | 1 | 9.00 | | | 2.1.12 | Grit Blasting to SA 1.0 - full | sqm | 1 | 10.00 | | | 2.1.13 | Grit Blasting to SA 2.0 - full | sqm | 1 | 12.00 | | | 2.1.14 | Touch up and full painting for each coat | sqm | 1 | 0.80 | | | | Boottop | | | | | | 2.1.15 | High Pressure Fresh Water Washing (500 Bar) | sqm | 1 | 1.10 | | | 2.1.16 | Fresh Water Washing Down | sqm | 1 | 0.50 | | | 2.1.17 | Hand Scraping | sqm | 1 | 1.00 | | | 2.1.18 | Grit Sweeping - full | sqm | 1 | 9.00 | | | 2.1.19 | Grit Blasting to SA 1.0 - full | sqm | 1 | 10.00 | | | 2.1.20 | Grit Blasting to SA 2.0 - full | sqm | 1 | 12.00 | | | 2.1.21 | Touch up and full painting for each coat | sqm | 1 | 0.80 | | | | Topside | | | | | | 2.1.22 | High Pressure Fresh Water Washing (500 Bar) hpwj | sqm | 1 | 1.10 | | | 2.1.23 | Hose down washing | sqm | 1 | 0.50 | | | 2.1.24 | Hand Scraping | sqm | 1 | 1.00 | | | 2.1.25 | Grit Sweeping - full | sqm | 1 | 9.00 | | | 2.1.26 | Grit Blasting to SA 1.0 - full | sqm | 1 | 10.00 | | | 2.1.27 | Grit Blasting to SA 2.0 - full | sqm | 1 | 12.00 | | | 2.1.28 | Touch up and full painting for each coat | sqm | 1 | 0.80 | | | | Cleaning and Painting Works in Holds and hatch covers inside | | | | | | 2.1.29 | High Pressure Fresh Water Washing (500 Bar) | sqm | 1 | 1.20 | | | 2.1.30 | Fresh Water Washing Down | sqm | 1 | 0.50 | | | 2.1.31 | Hand Scraping | sqm | 1 | 1.00 | | | 2.1.32 | Grit Sweeping - full | sqm | 1 | 10.00 | | | 2.1.33 | Grit Blasting to SA 1.0 - full | sqm | 1 | 12.00 | | | 2.1.34 | Grit Blasting to SA 2.0 - full | sqm | 1 | 14.00 | | | 2.1.35 | Touch up and ful painting for each coat | sqm | 1 | 1.20 | | | Note | Staging and cherry picker usage is included above prices in case | | | | | | | it is full blasting & painting. | | | | | | 2.1.36 | If spot blasting up to %50 staging will be added each Hold | hold | 1 | 1,000.00 | | | 2.2 | Hull Marking | | | | | | 2.2.1 | Repainting of draft marks & Plimsoll's marks,tug,truster figures | set | 1 | 700.00 | | | 2.2.2 | Repainting of vessel's name (port, straboard and aft) | set | 1 | 800.00 | | | 2.2.3 | Boottop line | m | 1 | 3.00 | | | | | | | | | | 3 | TANK CLEANING & DISPOSAL | | | | | | 3.1 | Ballast tank cleaning -hummering scraping heavy rust,collecting mud | cbm | I | 10.00 | | | 3.2 | Removal and disposal of mud to authorised shore facility | ton | 1 | 150.00 | | | 3.3 | F.O. tank cleaning for inspection -calculated min. 50 cbm- | cbm | 1 | 25.00 | | | 3.4 | D.O. tank cleaning for inspection -calculated min. 50 cbm- | cbm | 1 | 20.00 | | | 3.5 | Removal and disposal of sludge to authorised shore facility | ton | 1 | 250.00 | | | 3.6 | Bilge water disposal | ton | 1 | 70.00 | | | 3.7 | Pumping of oily bilge water by shipyard pump | cbm | 1 | 20.00 | | | | | | | | | | 4 | RUDDER,TAILSHAFT, PROPELLER AND WORKS | | | | | | 4.1 | Rudder | | | | | | 41.1 | Measurement of rudder pintle clearences | pcs | 1 | 200.00 | | | 41.2 | Remove access cover plates and check upper and lower pintle | pcs | 1 | 400.00 | | | 41.3 | Rudder blade dismantling and refitting | pcs | 1 | 3,000.00 | | | 41.4 | Rudder stock dismantling and refitting from steering gear | pcs | 1 | 3,500.00 | |
No  Description 描述 Unit 單位 Qty 數量 U. Price Total 總計
41.5 Dismounting/refitting of upper and/or lower rudder pintle
拆卸/重新安裝上部和/或下部舵柄銷
pCs 1 750.00
41.6 Polishing of pintles sleeve surface on lathe
在車床上拋光銷套表面
pcs 1 250.00
41.7 Stock gland packing renewal (packing yard supply)
庫存填料更換(填料場供應)
pCs 1 800.00
41.8 Air test of rudder to 0.2 kg / cm 2 0.2 kg / cm 2 0.2kg//cm20.2 \mathrm{~kg} / \mathrm{cm} 2
舵的空氣測試至 0.2 kg / cm 2 0.2 kg / cm 2 0.2kg//cm20.2 \mathrm{~kg} / \mathrm{cm} 2
pcs 1 200.00
41.9 Withdrawal of rudder stock / pintle bearings
撤回舵軸/鉸鏈軸承
pcs 1 600.00
41.10 Renewal pintle sleeve bronze/stainless steel -material owner suppl
更新銷套青銅/不銹鋼 - 材料擁有者供應
pcs 1 700.00
41.11 Renewal pintle bearing orkod/bronze - material owner supply-
更新銷軸軸承或鋼/銅 - 材料擁有者供應 -
pcs 1 500.00
41.12 Recondition pintle conical place -welding/machining -
重整銷錐形位置 - 焊接/加工 -
pCs 1 700.00
41.13 Bronze bearing/sleeve manufacturing - material include- gross
青銅軸承/套筒製造 - 材料包括 - 總重
kg 公斤 1 25.00
4.2 Tailshaft 尾軸
42.1 Removal and refitting of rope guard
拆卸和重新安裝繩索護罩
pcs 1 400.00
42.2 Measurement of stern tube clearences
艉管間隙的測量
pCS 1 200.00
42.3 Test of shaft with dye penetration
染劑滲透測試軸承
pcs 1 200.00
42.4 Test of shaft with magnaflux test or ultrasonic test
使用磁粉檢測或超聲波檢測的軸測試
pcs 1 400.00
42.5 Renewal oil seals -material yard supply-aft&frwd stern tube
更新油封 - 材料場供應 - 後方和前方艙管
set 設置 1 1,500.00
42.6 Propeller shaft withdrawal from outside/inside and refitting back
從外部/內部拔出螺旋槳軸並重新安裝回去
mm 1 16.00
42.7 Releasing/lifting of intermediate shaft to the inside
釋放/提升中間軸至內部
mm 1 10.00
42.8 Disconnect/connect of hydraulic coupling and withdrawal of tailshaft
液壓聯軸器的斷開/連接及尾軸的撤回
together with CPP hub (without dismounting of blades)(shaft dia.)
與 CPP 中心一起(不拆卸葉片)(軸徑)
mm 1 16.00
42.9 Opening and closing of interim shaft bearing for surveying
臨時軸承的開啟和關閉以進行測量
pcs 1 500.00
42.10 Deflection control from shaft flange (before entrance of
從軸法蘭的偏轉控制(進入之前的)
pcs 1 350.00
docking and after repair undocking position -per time)
對接和修理後的脫離位置 -每次)
42.11 Withdrawal of shaft bearings into stern tube frwd&aft
軸承撤回至艉管前後
mm 1 6.00
42.12 Manufacture new bearing -by white metal/babbit include grossw
製造新軸承 - 由白金屬/巴比特金屬製成,包括毛重
kg 公斤 1 110.00
42.13 Renewal of tallow packing- material yard supply -
再生牛脂包裝材料 yard 供應 -
pcs 1 800.00
42.14 Manufacture bronze bush of shaft - material include- grossweight
製造軸的銅套 - 材料包括 - 總重量
kg 公斤 1 25.00
42.15 Renewal bronze bush of shaft - material ow.supp and machining on lathe
軸的更新銅套 - 材料供應和車床加工
pcs 1 1,500.00
42.16 Epoxy coating to the shaft - if require -
如果需要,對軸進行環氧塗層處理 -
pcs 1 1,000.00
42.17 Chrome liner machining /polishing
鉻內襯加工/拋光
pcs 1 250.00
4.3 Propeller 螺旋槳
43.1 Propeller dismantling & refitting of conventional type
傳統型螺旋槳的拆卸與重新安裝
pcs 1 3,000.00
43.2 Removal of CPP propeller blades (per blade)
去除 CPP 螺旋槳葉片(每片葉片)
pcs 1 750.00
43.3 Propeller cleaning by acid
酸清洗螺旋槳
pcs 1 400.00
43.4 Propeller polishing by grinding tools
螺旋槳用磨具拋光
pcs 1 800.00
4.3.5 Repair propeller&balancing after if require After inspection
檢查後如有需要,修理螺旋槳及平衡
43.6 Dye penantration test on propeller
螺旋槳的染料滲透測試
pcs 1 250.00
43.7 C.P.P hub complete demonted renewal seals,bushes,bearings,cle
C.P.P 中心完整拆解更新密封件、衬套、轴承、清洁
aning,assambling renewal oil and testing-material owner supply- item 項目 1 5,000.00
5 SEA CHESTS 海洋箱
5.1 Remove of grill washing,cleaning and painting-paint owner supply-
去除烤架的清洗、清潔和上漆 - 油漆由業主提供 -
pcs 1 500.00
6 SEA VALVES 海閥
6.1 Opening of valves in place, cleaning, lapping of lids and seats,
閥門開啟,清潔,蓋子和座位的打磨,
internal coating, repacking of glands if necessary and closing
內部塗層,如有必要則重新包裝密封圈並關閉
with new gaskets. 配有新墊圈。
6.2 Globe/stop/angle/gate/butterfly/non-return and storm valves
球閥/止回閥/角閥/閘閥/蝴蝶閥/不回流閥和風暴閥
mm 1 1.20
6.3 Calculate min .50 mm if less then
計算最小 0.50 毫米如果小於
6.4 In case valve is removed to workshop and machined on lathe
如果閥門被移到車間並在車床上加工
mm 1 1.50
6.5 All kind of access works&other renewals, repairs are to be extra
所有類型的接入工作及其他續約、維修將另行收費
6.6 Maintanence of remote control systems to be extra
遙控系統的維護需額外收費
6.7 Renewal of owner supplied valves to be charged 50 % 50 % 50%50 \% of overhaul
更換業主提供的閥門將收取 50 % 50 % 50%50 \% 的維修費用
6.8 prices excluding pipe/flange modifications
不包括管道/法蘭修改的價格
No Description Unit Qty U. Price Total 41.5 Dismounting/refitting of upper and/or lower rudder pintle pCs 1 750.00 41.6 Polishing of pintles sleeve surface on lathe pcs 1 250.00 41.7 Stock gland packing renewal (packing yard supply) pCs 1 800.00 41.8 Air test of rudder to 0.2kg//cm2 pcs 1 200.00 41.9 Withdrawal of rudder stock / pintle bearings pcs 1 600.00 41.10 Renewal pintle sleeve bronze/stainless steel -material owner suppl pcs 1 700.00 41.11 Renewal pintle bearing orkod/bronze - material owner supply- pcs 1 500.00 41.12 Recondition pintle conical place -welding/machining - pCs 1 700.00 41.13 Bronze bearing/sleeve manufacturing - material include- gross kg 1 25.00 4.2 Tailshaft 42.1 Removal and refitting of rope guard pcs 1 400.00 42.2 Measurement of stern tube clearences pCS 1 200.00 42.3 Test of shaft with dye penetration pcs 1 200.00 42.4 Test of shaft with magnaflux test or ultrasonic test pcs 1 400.00 42.5 Renewal oil seals -material yard supply-aft&frwd stern tube set 1 1,500.00 42.6 Propeller shaft withdrawal from outside/inside and refitting back mm 1 16.00 42.7 Releasing/lifting of intermediate shaft to the inside mm 1 10.00 42.8 Disconnect/connect of hydraulic coupling and withdrawal of tailshaft together with CPP hub (without dismounting of blades)(shaft dia.) mm 1 16.00 42.9 Opening and closing of interim shaft bearing for surveying pcs 1 500.00 42.10 Deflection control from shaft flange (before entrance of pcs 1 350.00 docking and after repair undocking position -per time) 42.11 Withdrawal of shaft bearings into stern tube frwd&aft mm 1 6.00 42.12 Manufacture new bearing -by white metal/babbit include grossw kg 1 110.00 42.13 Renewal of tallow packing- material yard supply - pcs 1 800.00 42.14 Manufacture bronze bush of shaft - material include- grossweight kg 1 25.00 42.15 Renewal bronze bush of shaft - material ow.supp and machining on lathe pcs 1 1,500.00 42.16 Epoxy coating to the shaft - if require - pcs 1 1,000.00 42.17 Chrome liner machining /polishing pcs 1 250.00 4.3 Propeller 43.1 Propeller dismantling & refitting of conventional type pcs 1 3,000.00 43.2 Removal of CPP propeller blades (per blade) pcs 1 750.00 43.3 Propeller cleaning by acid pcs 1 400.00 43.4 Propeller polishing by grinding tools pcs 1 800.00 4.3.5 Repair propeller&balancing after if require After inspection 43.6 Dye penantration test on propeller pcs 1 250.00 43.7 C.P.P hub complete demonted renewal seals,bushes,bearings,cle aning,assambling renewal oil and testing-material owner supply- item 1 5,000.00 5 SEA CHESTS 5.1 Remove of grill washing,cleaning and painting-paint owner supply- pcs 1 500.00 6 SEA VALVES 6.1 Opening of valves in place, cleaning, lapping of lids and seats, internal coating, repacking of glands if necessary and closing with new gaskets. 6.2 Globe/stop/angle/gate/butterfly/non-return and storm valves mm 1 1.20 6.3 Calculate min .50 mm if less then 6.4 In case valve is removed to workshop and machined on lathe mm 1 1.50 6.5 All kind of access works&other renewals, repairs are to be extra 6.6 Maintanence of remote control systems to be extra 6.7 Renewal of owner supplied valves to be charged 50% of overhaul 6.8 prices excluding pipe/flange modifications | No | Description | Unit | Qty | U. Price | Total | | :---: | :---: | :---: | :---: | :---: | :---: | | 41.5 | Dismounting/refitting of upper and/or lower rudder pintle | pCs | 1 | 750.00 | | | 41.6 | Polishing of pintles sleeve surface on lathe | pcs | 1 | 250.00 | | | 41.7 | Stock gland packing renewal (packing yard supply) | pCs | 1 | 800.00 | | | 41.8 | Air test of rudder to $0.2 \mathrm{~kg} / \mathrm{cm} 2$ | pcs | 1 | 200.00 | | | 41.9 | Withdrawal of rudder stock / pintle bearings | pcs | 1 | 600.00 | | | 41.10 | Renewal pintle sleeve bronze/stainless steel -material owner suppl | pcs | 1 | 700.00 | | | 41.11 | Renewal pintle bearing orkod/bronze - material owner supply- | pcs | 1 | 500.00 | | | 41.12 | Recondition pintle conical place -welding/machining - | pCs | 1 | 700.00 | | | 41.13 | Bronze bearing/sleeve manufacturing - material include- gross | kg | 1 | 25.00 | | | 4.2 | Tailshaft | | | | | | 42.1 | Removal and refitting of rope guard | pcs | 1 | 400.00 | | | 42.2 | Measurement of stern tube clearences | pCS | 1 | 200.00 | | | 42.3 | Test of shaft with dye penetration | pcs | 1 | 200.00 | | | 42.4 | Test of shaft with magnaflux test or ultrasonic test | pcs | 1 | 400.00 | | | 42.5 | Renewal oil seals -material yard supply-aft&frwd stern tube | set | 1 | 1,500.00 | | | 42.6 | Propeller shaft withdrawal from outside/inside and refitting back | mm | 1 | 16.00 | | | 42.7 | Releasing/lifting of intermediate shaft to the inside | mm | 1 | 10.00 | | | 42.8 | Disconnect/connect of hydraulic coupling and withdrawal of tailshaft | | | | | | | together with CPP hub (without dismounting of blades)(shaft dia.) | mm | 1 | 16.00 | | | 42.9 | Opening and closing of interim shaft bearing for surveying | pcs | 1 | 500.00 | | | 42.10 | Deflection control from shaft flange (before entrance of | pcs | 1 | 350.00 | | | | docking and after repair undocking position -per time) | | | | | | 42.11 | Withdrawal of shaft bearings into stern tube frwd&aft | mm | 1 | 6.00 | | | 42.12 | Manufacture new bearing -by white metal/babbit include grossw | kg | 1 | 110.00 | | | 42.13 | Renewal of tallow packing- material yard supply - | pcs | 1 | 800.00 | | | 42.14 | Manufacture bronze bush of shaft - material include- grossweight | kg | 1 | 25.00 | | | 42.15 | Renewal bronze bush of shaft - material ow.supp and machining on lathe | pcs | 1 | 1,500.00 | | | 42.16 | Epoxy coating to the shaft - if require - | pcs | 1 | 1,000.00 | | | 42.17 | Chrome liner machining /polishing | pcs | 1 | 250.00 | | | 4.3 | Propeller | | | | | | 43.1 | Propeller dismantling & refitting of conventional type | pcs | 1 | 3,000.00 | | | 43.2 | Removal of CPP propeller blades (per blade) | pcs | 1 | 750.00 | | | 43.3 | Propeller cleaning by acid | pcs | 1 | 400.00 | | | 43.4 | Propeller polishing by grinding tools | pcs | 1 | 800.00 | | | 4.3.5 | Repair propeller&balancing after if require After inspection | | | | | | 43.6 | Dye penantration test on propeller | pcs | 1 | 250.00 | | | 43.7 | C.P.P hub complete demonted renewal seals,bushes,bearings,cle | | | | | | | aning,assambling renewal oil and testing-material owner supply- | item | 1 | 5,000.00 | | | | | | | | | | 5 | SEA CHESTS | | | | | | 5.1 | Remove of grill washing,cleaning and painting-paint owner supply- | pcs | 1 | 500.00 | | | | | | | | | | 6 | SEA VALVES | | | | | | 6.1 | Opening of valves in place, cleaning, lapping of lids and seats, | | | | | | | internal coating, repacking of glands if necessary and closing | | | | | | | with new gaskets. | | | | | | 6.2 | Globe/stop/angle/gate/butterfly/non-return and storm valves | mm | 1 | 1.20 | | | 6.3 | Calculate min .50 mm if less then | | | | | | 6.4 | In case valve is removed to workshop and machined on lathe | mm | 1 | 1.50 | | | 6.5 | All kind of access works&other renewals, repairs are to be extra | | | | | | 6.6 | Maintanence of remote control systems to be extra | | | | | | 6.7 | Renewal of owner supplied valves to be charged $50 \%$ of overhaul | | | | | | 6.8 | prices excluding pipe/flange modifications | | | | | | | | | | | | | | | | | | |
No  Description 描述 Unit 單位 Qty 數量 U. Price Total 總計
7 CATHODIC PROTECTION WORKS
陰極保護工程
7.1 Anode installation on hull- owner supply-
船體上的陽極安裝 - 由業主提供 -
pcs 1 20.00
7.2 Anode installation in ballast tanks- owner supply-
壓艙水艙中的陽極安裝 - 由業主提供 -
pcs 1 25.00
7.3 Supply of Zinc anodes 鋅陽極的供應 kg 公斤 1 8.00
7.4 Supply of Al. anodes 鋁陽極的供應 kg 公斤 1 7.50
8 ANCHOR CHAIN WORKS 錨鏈工廠
8.1 Ranging out for inspection and restore again port&strbd.
再次對左舷和右舷進行檢查和修復。
set 設置 1 1,500.00
8.2 Cleaning by high pressure jetwash
高壓水槍清洗
set 設置 1 800.00
8.3 Measurements of links, marking with paint
鏈接的測量,使用油漆標記
set 設置 1 500.00
8.4 Renewal of kenter schakle - material owner supply -
更新 kenter schakle - 材料擁有者供應 -
pcs 1 200.00
8.5 Changing cable end for end
更換電纜的兩端
pcs 1 500.00
8.6 Welding of missing studs 焊接缺失的螺柱 pcs 1 10.00
9 CHAIN LOCKERS 鏈鎖箱
9.1 Opening-up, removing dry dirt and debris, handscaling, cleaning
開放、去除乾燥污垢和碎屑、手工刮除、清潔
and painting one coat -paint owner supply-
和塗上一層漆 - 漆料供應商 -
pcs 1 1,500.00
9.2 Removal of mud 去除泥土 ton  1 150.00
10 STEEL WORKS 鋼鐵廠
10.1 Following notes to be applied all quoted steel prices
以下註解適用於所有報價的鋼鐵價格
10.1.1 Steel access openings to be charged as 50% of steel renewal
鋼材進口開口將按鋼材更新的 50%收費
10.1.2 Measurements will be done with the maximum breadth and lenght
測量將以最大寬度和長度進行
10.1.3 Total steel weight calculation will be carried out by measuring with
將通過測量進行總鋼材重量計算
vessel and steel dencity to be calculated 8 t / m 3 8 t / m 3 8t//m38 \mathrm{t} / \mathrm{m} 3
計算船隻和鋼材密度 8 t / m 3 8 t / m 3 8t//m38 \mathrm{t} / \mathrm{m} 3
10.1.4 Unless otherwise specified all steel plates will be Grade A quality
除非另有說明,所有鋼板將為 A 級質量
and shopprimed conditioned
和商店已準備好條件
10.1.5 For testing of tanks, loading/ discharging will be carried out by
對於坦克的測試,裝載/卸載將由
vessel' s pumps. 船舶的泵。
10.1.6 All welding seams inspection with x-rays and ultrasonic will be
所有焊接接縫的檢查將使用 X 光和超聲波進行
owner/ manager' s account. In case a failure determines at the
業主/經理的帳戶。如果故障確定在
inspections after fixing the failure the additional x x xx-rays and
修復故障後的檢查額外的 x x xx -射線和
ultrasonic which may have taken will be Yard's account.
超聲波可能已經採取了 Yard 的帳戶。
10.1.7 Time spent for tank cleaning workss which is related with or
與或有關的油箱清洗工作所花費的時間
obstructs the steel works will not be included in repair period.
阻礙鋼鐵廠的將不包括在修理期間內。
10.1.8 All steel scrap shall be yard' s property.
所有鋼鐵廢料均為場地的財產。
10.1.9 Staging is included in steel renewal prices for min. 600 kg steel
鋼材更新價格中包含了最少 600 公斤鋼材的安裝費用
renewal ordered above a staging tower 6 sqm base area.