中国电力国际有限公司
China Electric Power International Co., Ltd.

哈萨克斯坦Dostyk风电场三一重能SI-171625MW
Kazakhstan Dostyk wind farm SANY SI-171625MW type

风力发电机组塔架倾斜度检测报告
Wind turbine tower inclination detection report

报告编号
report number

CGC-20B-FNj-2023-216-01A/0
CGC - 20B-FNj-202 3-216-0 1A / 0

合同编号
Contract number

CGC23-TS-11027

文件级别
file level

客户酌处
Customer discretion

北京鉴衡认证中心有限公司
Beijing Jianheng Certification Center Co., Ltd.

202311
November 202

II

检测依据:
Test basis:

GB/T 20319-2017 风力发电机组验收规范》
" GB/T 20319-2017 Wind Turbine Set Acceptance Specifications"

检测时间:
Detection time:

20231122~20231125
November 22 , 202 3 ~ November 25 , 202 3

检测地点:
Testing location:

哈萨克斯坦阿拉木图州阿拉阔里Dostyk风电场
Dostyk Wind Farm in Alakouli, Almaty Region, Kazakhstan

生产单位:
Production unit:

三一重能股份有限公司
Sany Heavy Energy Co., Ltd.

地址:北京市昌平区北清路三一产业园
Address: Sany Industrial Park, Beiqing Road, Changping District, Beijing

委托单位:
Entrusting unit:

中国电力国际有限公司
China Electric Power International Co., Ltd.

地址:北京市海淀区北四环西路56号辉煌时代大厦东座
Address: East Building, Brilliant Times Building, No. 56 , Beisihuan West Road, Haidian District, Beijing

检测单位:
Testing unit:

北京鉴衡认证中心有限公司
Beijing Jianheng Certification Center Co., Ltd.

地址:北京市东城区和平里北街626号楼三层301
Address: Room 301, 3rd Floor, Building 26 , No. 6 Hepingli North Street, Dongcheng District, Beijing

写:
write :

核:
Review :

准:
approve :

检测单位(盖章):
Testing unit (stamped):

北京鉴衡认证中心有限公司
Beijing Jianheng Certification Center Co., Ltd.

期:
date :

20231125
November 25 , 202


statement

本报告未加盖北京鉴衡认证中心有限公司公章无效。
This report is invalid if it is not stamped with the " official seal of Beijing Jianheng Certification Center Co., Ltd. "

本报告无编写、审核、批准人签字无效。
This report is invalid without the signature of the person who wrote, reviewed and approved it.

本报告共5页,涂改、缺页无效。部分摘录、复制使用,未经北京鉴衡认证中心有限公司书面确认无效。
This report has a total of 5 pages. Any corrections or missing pages will be invalid. Partial excerpts and reproduction are invalid without written confirmation from Beijing Jianheng Certification Center Co., Ltd.

本报告仅适用于中国电力国际有限公司哈萨克斯坦Dostyk风电场三一重能SI-171625型风力发电机组塔架倾斜度检测项目
This report only applies to China Power International Co., Ltd. Kazakhstan Dostyk Wind Farm Sany Heavy Energy SI-171625 wind turbine tower inclination detection project .

本报告仅对被测机组受检时的状态负责。
This report is only responsible for the status of the tested unit at the time of testing .

注:文件级别客户酌处是指客户依据合同要求决定公开范围。
Note: Document level " customer discretion " means that the customer decides the scope of disclosure based on contract requirements.

I

1项目概述
1Project Overview

中国电力国际有限公司委托,北京鉴衡认证中心有限公司对位于哈萨克斯坦阿拉木图州阿拉阔里区Dostyk风电场8台三一重能SI-171625风力发电机组进行塔架倾斜度检测工作;主要目的为检查风力发电机组塔架的运行状态,及时发现塔架异常倾斜问题,确保风力发电机组安全运行。
Entrusted by China Electric Power International Co., Ltd. , Beijing Jianheng Certification Center Co., Ltd. conducted tower inclination testing on eight Sany Heavy Energy SI-171625 wind turbines located at the Dostyk Wind Farm in Alaqoli District, Almaty State, Kazakhstan. Work; the main purpose is to check the operating status of the wind turbine tower, promptly detect abnormal tilt problems of the tower, and ensure the safe operation of the wind turbine.

检测时间:20231122~20231125日。
Testing time : November 22 , 2023 ~ November 25 , 2023 .

2检测依据
2 Test basis

本次检测依据的技术标准及规范为:
The technical standards and specifications based on this inspection are:

GB/T 20319-2017 风力发电机组验收规范;
GB/T 20319-2017 Wind turbine acceptance specifications;

GB/T 19072-2010 风力发电机组塔架;
GB/T 19072-2010 Wind turbine tower;

GB/T 31997-2015 风力发电场项目建设工程验收规程。
GB/T 31997-2015 Wind farm project construction engineering acceptance procedures.

3被测风力发电机组信息
3 Measured wind turbine information

本次被检测机组的相关信息见表3-1
The relevant information of the units tested this time is shown in Table 3-1 .

3-1 风力发电机组相关信息
Table 3-1 Wind turbine related information

机组型号
Unit model

SI-171625
SI-171625 type

机组制造商
Unit manufacturer

三一重能股份有限公司
Sany Heavy Energy Co., Ltd.

塔架高度
Tower height

100
100 meters

塔架类型
Tower type

锥形筒式结构
Tapered barrel structure

检测数量
Test quantity

8台(G1#~G8#
8 units ( G 1#~ G 8# )

5 / 5
Page 5 / Total 5

4检测项目及方法
4 Test items and methods

4.1 检测设备
4.1 Testing equipment

本次检测使用的仪器为中纬ZOOM35Pro型全站仪。
The instrument used in this inspection is the mid-latitude ZOOM35Pro total station.

4-1 中纬ZOOM35Pro型全站仪
Figure 4-1 Mid-latitude ZOOM35Pro total station

5 / 5
Page 5 / Total 5

4.2 检测方法
4.2 Detection methods

以塔架底部法兰为基准面,以塔架顶部法兰为测量对象,两法兰中心连线在垂直于基准面的给定圆柱面区域内变动,这个圆柱的直径就是公差值,即倾斜度。如下图所示(LOO’):
Taking the bottom flange of the tower as the datum plane and the top flange of the tower as the measurement object, the line connecting the centers of the two flanges changes within a given cylindrical surface area perpendicular to the datum plane. The diameter of this cylinder is the tolerance value, that is inclination. As shown in the figure below ( L OO' ):

4-2 塔架倾斜度测量方法示意图
Figure 4-2 Schematic diagram of tower inclination measurement method

其中:O点为塔架底法兰理论圆心;
Among them: Point O is the theoretical circle center of the tower bottom flange;

O’点为待测法兰理论圆心;
Point O' is the center of the theoretical circle of the flange to be tested;

XY为距离塔架高度1.0~1.5倍距离处观测点,其中XOYO
X and Y are observation points at a distance of 1.0~1.5 times the height of the tower , where XO YO ;

塔架倾斜度应满足公式(1)的要求。
The inclination of the tower should meet the requirements of formula ( 1 ).

式(1
Formula ( 1 )

式中:LOO’为所测量塔架段的偏移距离,单位为mm
In the formula: L OO' is the offset distance of the measured tower section, in mm ;

H为所测量塔架段的高度,单位为m
H is the height of the measured tower section, in m ;

现场检测的步骤如下:
The steps for on-site inspection are as follows:

在塔架底部相隔90°建立两个基点,以垂直方向为基线;
Establish two base points at the bottom of the tower 90° apart, with the vertical direction as the baseline;

测量塔架顶部法兰中心点坐标;
Measure the coordinates of the center point of the flange on the top of the tower;

测量塔架底部法兰中心点坐标;
Measure the coordinates of the center point of the flange at the bottom of the tower;

计算最大倾斜距离、倾斜角度和倾斜度;
Calculate maximum tilt distance, tilt angle and tilt;

必要时增加测点保证检测精度。
If necessary, add measuring points to ensure detection accuracy.

由于风力发电机组塔架倾斜度检测过程受到风速影响会造成塔架晃动,由此产生测量的不确定度,因此检测过程尽量选择小风速机组停机的状态下开展。
Since the wind turbine tower inclination detection process is affected by wind speed, which will cause the tower to shake, resulting in measurement uncertainty, the detection process should be carried out with the unit shut down at low wind speeds as much as possible.

5检测结果
5 test results

本次对哈萨克斯坦阿拉木图州阿拉阔里区Dostyk风电场8三一重能SI-171625风力发电机组塔架倾斜度检测结果见表5-1
The results of the tower inclination detection of eight SANY SI-171625 wind turbines at the Dostyk Wind Farm in Alaqoli District , Almaty Prefecture, Kazakhstan are shown in Table 5-1 .

5-1 塔架倾斜度检测结果
Table 5-1 Tower inclination detection results

序号
serial number

机组号
Unit number

观测点位
Observation point

实测高度(m
Actual measured height ( m )

检测分析
Detection and analysis

判定结果
Judgment result

偏移距离(m
Offset distance ( m )

倾斜度(mm/m
Inclination ( mm/m )

1

G1

X

94.746

0.1573

1.6600

合格
qualified

2

Y

93.605

0.1485

1.5864

合格
qualified

3

G2

X

94.793

0.1254

1.3229

合格
qualified

4

Y

94.950

0.1151

1.2123

合格
qualified

5

G3

X

93.439

0.0429

0.4596

合格
qualified

6

Y

92.551

0.0567

0.6129

合格
qualified

7

G4

X

94.878

0.1633

1.7214

合格
qualified

8

Y

95.172

0.0716

0.7524

合格
qualified

9

G5

X

94.911

0.0687

0.7236

合格
qualified

10

Y

95.416

0.1080

1.1324

合格
qualified

11

G6

X

92.468

0.2648

2.8632

合格
qualified

12

Y

94.951

0.0837

0.8812

合格
qualified

13

G7

X

95.019

0.0294

0.3095

合格
qualified

14

Y

94.751

0.0564

0.5948

合格
qualified

15

G8

X

94.772

0.1229

1.2970

合格
qualified

16

Y

94.397

0.0729

0.7727

合格
qualified

备注:依据《风力发电机组验收规范》(GB/T 20319-2017),塔架倾斜度在8mm/m以内视为合格。
Note: According to the "Wind Turbine Set Acceptance Specification" ( GB/T 20319-2017 ), the tower inclination is within 8mm/m as qualified.

6结论
6 Conclusion

经现场检测,截止到20231125日,位于哈萨克斯坦阿拉木图州阿拉阔里区Dostyk风电场8三一重能SI-171625风力发电机组塔架的倾斜状态在正常范围内。
After on-site testing, as of November 25 , 2023 , the tilt status of the towers of eight Sany Heavy Energy SI-171625 wind turbines located in the Dostyk Wind Farm in Alaqoli District, Almaty State, Kazakhstan, was within the normal range . Inside.

根据《风力发电机组验收规范》(GB/T20319-2017)的规定,塔架倾斜度不应大于8mm/m,其中由于基础不均匀沉降导致的塔架倾斜应不大于3mm/m;其他原因造成的塔架倾斜不应大于5mm/m
According to the "Code for Acceptance of Wind Turbine Generators" (GB/T20319-2017), the inclination of the tower should not be greater than 8mm/m, of which the inclination of the tower due to uneven settlement of the foundation should not be greater than 3mm/m; caused by other reasons The tower inclination should not be greater than 5mm/m.