这是用户在 2025-3-18 9:40 为 https://app.immersivetranslate.com/pdf-pro/8f34a0ab-7ee8-4866-8560-6d4ef867cd0e/?isTrial=true 保存的双语快照页面,由 沉浸式翻译 提供双语支持。了解如何保存?

METHODOLOGY TO UPDATE A330 A/C ELA AND TO VALIDATE NEW ELECTRICAL LOAD INSTALLATION

Technical Report
更新 A330 飞机电气负载分析(ELA)并验证新电气负载安装的方法论 技术报告



Technical Report  技术报告
}
REFERENCE G24RP1212309
A/C APPLICABILITY  A/C 适用性 LR-A330
ATA APPLICABILITY  ATA 适用性 24
CUSTOMER
CONFIDENTIALITY Airbus Internal  空客内部
DOCUMENT LEVEL  文档级别 2
REFERENCE G24RP1212309 A/C APPLICABILITY LR-A330 ATA APPLICABILITY 24 CUSTOMER CONFIDENTIALITY Airbus Internal DOCUMENT LEVEL 2| REFERENCE | G24RP1212309 | | :--- | :--- | | A/C APPLICABILITY | LR-A330 | | ATA APPLICABILITY | 24 | | CUSTOMER | | | CONFIDENTIALITY | Airbus Internal | | DOCUMENT LEVEL | 2 |
SUMMARY:  摘要:
This document supersedes the ELA “How to Use” supplied by Airbus with the ELA at A/C delivery.
本文件取代了空客在飞机交付时随 ELA 提供的“如何使用”指南。

It is applicable to all A330 models and gives the information necessary for:
它适用于所有 A330 型号,并提供以下必要信息:
  • The validation of a new electrical load on the A/C
    A/C 上新电气负载的验证
  • Update of the ELA after the installation of a new electrical load
    安装新电气负载后更新 ELA
This document has these parts:
本文档包含以下部分:
  • Overview of ELA formats
    ELA 格式概述
  • Description of the calculation methodology used in the ELAs:
    ELA 中使用的计算方法的描述:
  • At busbar level  在母线层面
  • At converter level  在转换器级别
  • At generator level  在发电机层面
  • Rules for the validation and installation of a customer-originated modification (Supplemental Type Certificate, Engineering Order, etc.) with the related electrical load analysis process
    客户发起修改(补充型号合格证、工程指令等)的验证和安装规则及相关电气负载分析流程
  • Rules for the validation and installation of a Vendor or Airbus Service Bulletin (SB)
    供应商或空客服务通告(SB)的验证和安装规则
CAUTION: it is strictly prohibited to install a load or to increase an existing load on:
注意:严禁在以下位置安装负载或增加现有负载:
  • Emergency network/busbars (busbars 4xxPP, 8xxPP, 4xxXP, 9xxXP, 501PP)
    应急网络/母线(母线 4xxPP、8xxPP、4xxXP、9xxXP、501PP)
  • Battery busbars  电池汇流条
  • Technical busbars 3xxPP and 9xxPP Primary technical busbars and dummy busbars
    技术母线 3xxPP 和 9xxPP 主要技术母线和虚拟母线

    Modifications on these busbars are only permitted through an Airbus Service Bulletin (SB) or with Airbus approval.
    对这些汇流条的修改仅允许通过空客服务通告(SB)或获得空客批准后进行。

KEYWORDS  关键词

ELA;A/L modification;SB procedure
ELA;A/L 修改;SB 程序

RELATED DOCUMENTS  相关文件
NAME SIGLUM - FUNCTION  SIGLUM - 功能 DATE & SIGNATURE  日期与签名
AUTHOR(S)  作者
BARBIERO
Frederic
BARBIERO Frederic| BARBIERO | | :--- | | Frederic |

EYNE1 - 电力工程师
EYNE1 - Electrical Power
Engineer
EYNE1 - Electrical Power Engineer| EYNE1 - Electrical Power | | :--- | | Engineer |
GAUCHERON
Philippe
GAUCHERON Philippe| GAUCHERON | | :--- | | Philippe |
EYNE1 - Head of EYNE1
EYNE1 - EYNE1 负责人
ZAGLIO Denis

EYNE - 电气系统首席架构师
EYNE - Elec. Systems Lead
Architect
EYNE - Elec. Systems Lead Architect| EYNE - Elec. Systems Lead | | :--- | | Architect |
NAME SIGLUM - FUNCTION DATE & SIGNATURE AUTHOR(S) "BARBIERO Frederic" "EYNE1 - Electrical Power Engineer" "GAUCHERON Philippe" EYNE1 - Head of EYNE1 ZAGLIO Denis "EYNE - Elec. Systems Lead Architect" | | NAME | SIGLUM - FUNCTION | DATE & SIGNATURE | | :--- | :--- | :--- | :--- | | AUTHOR(S) | BARBIERO <br> Frederic | EYNE1 - Electrical Power <br> Engineer | | | | | | | | | | | | | | GAUCHERON <br> Philippe | EYNE1 - Head of EYNE1 | | | | | | | | | ZAGLIO Denis | EYNE - Elec. Systems Lead <br> Architect | |
METHODOLOGY TO UPDATE A330 A/C ELA AND TO VALIDATE NEW ELECTRICAL LOAD INSTALLATION
更新 A330 飞机电气负载分析(ELA)并验证新电气负载安装的方法
LIST OF DISTRIBUTION  分发清单
DEPARTMENT/ COMPANY  DEPARTMENT/   COMPANY  {:[" DEPARTMENT/ "],[" COMPANY "]:}\begin{aligned} & \text { DEPARTMENT/ } \\ & \text { COMPANY } \end{aligned} NAME P.O. BOX COVER PAGE ONLY  仅封面页 NOTE WITHOUT ATTACHMENT  注意:无附件 NOTE WITH ATTACHMENT  带附件的备注
EYNE Christophe MONTRET
EYNE Philippe GAUCHERON
EYNE Denis ZAGLIO
EYNE Anais PAGE
EYNE Stephanie ROSINE
EYNE Marie-Laure MAURIN
EYNE Olivier RASPATI-LORNAC  奥利维尔·拉斯帕蒂-洛纳克
SEDYW Alexandro RODRIGUEZ
SEDYW2 Pascal BLOT
AIEYM Anna MATHEW  安娜·马修
AIEYM Aishwarya BALAJI
NO. OF COPIES  副本数量 0 0 0
" DEPARTMENT/ COMPANY " NAME P.O. BOX COVER PAGE ONLY NOTE WITHOUT ATTACHMENT NOTE WITH ATTACHMENT EYNE Christophe MONTRET EYNE Philippe GAUCHERON EYNE Denis ZAGLIO EYNE Anais PAGE EYNE Stephanie ROSINE EYNE Marie-Laure MAURIN EYNE Olivier RASPATI-LORNAC SEDYW Alexandro RODRIGUEZ SEDYW2 Pascal BLOT AIEYM Anna MATHEW AIEYM Aishwarya BALAJI NO. OF COPIES 0 0 0| $\begin{aligned} & \text { DEPARTMENT/ } \\ & \text { COMPANY } \end{aligned}$ | NAME | P.O. BOX | COVER PAGE ONLY | NOTE WITHOUT ATTACHMENT | NOTE WITH ATTACHMENT | | :---: | :---: | :---: | :---: | :---: | :---: | | EYNE | Christophe MONTRET | | | | | | EYNE | Philippe GAUCHERON | | | | | | EYNE | Denis ZAGLIO | | | | | | EYNE | Anais PAGE | | | | | | EYNE | Stephanie ROSINE | | | | | | EYNE | Marie-Laure MAURIN | | | | | | EYNE | Olivier RASPATI-LORNAC | | | | | | SEDYW | Alexandro RODRIGUEZ | | | | | | SEDYW2 | Pascal BLOT | | | | | | AIEYM | Anna MATHEW | | | | | | AIEYM | Aishwarya BALAJI | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | NO. OF COPIES | | | 0 | 0 | 0 |
METHODOLOGY TO UPDATE A330 A/C ELA AND TO VALIDATE NEW ELECTRICAL LOAD INSTALLATION
更新 A330 飞机电气负载分析(ELA)并验证新电气负载安装的方法
ORIGIN EYNE1  起源 EYNE1
REFERENCE G24RP1212309  参考 G24RP1212309
Technical Report  技术报告
ISsue 3.0  问题 3.0
DATE 21 Feb 2017
日期 2017 年 2 月 21 日

RECORD OF REVISIONS  修订记录
ISSUE DATE EFFECT ON  影响 REASONS FOR REVISION  修订原因
PAGE PARA
1.0 02 Feb 2012  2012 年 2 月 2 日 N/A N/A 1 st 1 st  1^("st ")1^{\text {st }} issue of the document
1 st 1 st  1^("st ")1^{\text {st }} 文档的发行
2.0 25 Sept 2012  2012 年 9 月 25 日 All  全部 All  全部 2 nd 2 nd  2^("nd ")2^{\text {nd }} issue of the document
2 nd 2 nd  2^("nd ")2^{\text {nd }} 文档的发行
ISSUE DATE EFFECT ON REASONS FOR REVISION PAGE PARA 1.0 02 Feb 2012 N/A N/A 1^("st ") issue of the document 2.0 25 Sept 2012 All All 2^("nd ") issue of the document| ISSUE | DATE | EFFECT ON | REASONS FOR REVISION | | | :--- | :--- | :--- | :--- | :--- | | | | PAGE | PARA | | | 1.0 | 02 Feb 2012 | N/A | N/A | $1^{\text {st }}$ issue of the document | | 2.0 | 25 Sept 2012 | All | All | $2^{\text {nd }}$ issue of the document |