2.1 Drilling the Floor  2.1 在地板上钻孔

2.1.1 Placing the Floor Template
2.1.1 放置地板模板

  1. Position floor template according to the site specific drawing.
    根据场地特定的图纸定位楼板模板。

    Fig. 1: Emotion Floor Template
    图 1: Emotion Floor 模板
    Emotion Floor Template
    i

    The back edge of the template should be at least 66” from the wall (or from any other obstacle located behind the gantry), this distance will allow for positioning the PET gantry into its’ maximum service position.
    模板的后边缘应与墙壁(或位于龙门架后面的任何其他障碍物)至少保持 66 英寸的距离,此距离将允许将 PET 龙门架定位到其最大使用位置。

  2. Align and install the template segments with the 8 template brackets, see template graphic for detailed layout.
    将模板段与 8 个模板支架对齐并安装,有关详细布局,请参阅模板图。

    Fig. 2: Securing segments of the template together
    图 2: 将模板的各段固定在一起
    Securing segments of the template together
  3. Position the polycoated paper underneath.
    将涂布纸放在下面。

    -Slide the sheets underneath the template sections (polycoated side facing up),
    - 将片材滑到模板部分下方(涂布面朝上),

    Two 6 feet pieces (PHS sections) and one 12 feet piece (gantry sections). The paper will reduce the amount of the adhesive clean up later in the process.
    两个 6 英尺件(PHS 部分)和一个 12 英尺件(龙门部分)。该纸将减少该过程后期的胶粘剂清理量。

    Fig. 3: Template placement
    图 3: 模板放置
    Template placement
    i

    The floor template must lie flat on the floor for straight holes to be drilled. Correct any situations that cause the floor template to bow.
    地板模板必须平放在地板上,以便钻出直孔。更正导致地板模板弯曲的任何情况。

  4. Use a 5/32” diameter SDS concrete drill bit, drill holes for tapcon screws and secure template sections into place.
    使用直径为 5/32 英寸的 SDS 混凝土钻头,为攻丝螺钉钻孔并将模板部分固定到位。

  5. If you are performing a seismic installation, refer now to the floor preparation instructions for seismic installations in appendix B.
    如果您正在进行抗震安装,请立即参考附录 B 中抗震安装的地板准备说明。

2.1.2 Drilling 5/8” Holes
2.1.2 钻 5/8“ 孔

i

Before drilling the 5/8” diameter holes, note that the template sections are used for both Emotion and Sensation installations. The two side-plate template for the gantry have two holes with an inscription that indicates the type of installation for which holes should be drilled. Only drill the holes that is for the Emotion CT gantry.
在钻 5/8 英寸直径的孔之前,请注意模板部分用于 Emotion 和 Sensation 安装。龙门架的两个侧板模板有两个孔,上面刻有铭文,表示应钻孔的安装类型。只钻用于 Emotion CT 龙门架的孔。

i

Confirm with the site engineer that the minimum concrete thickness is at least 4.5” in nonseismic regions. The minimum concrete thickness in seismic regions is not < 6”.
与现场工程师确认,在非地震区域,最小混凝土厚度至少为 4.5 英寸。地震区域的最小混凝土厚度不超过 6 <”。

i

Do not begin drilling until the template is securely in place.
在模板牢固就位之前,不要开始钻孔。

i

Do not drill the last two (rearmost) holes in the template.
不要在模板中钻最后两个(最后的)孔。

Fig. 4: The holes in the template that are not to be drilled
图 4: 模板上不需要钻孔的孔
The holes in the template that are not to be drilled

(1)

The two rearmost holes  最后面的两个孔

  1. Install the SDS drill bit into the SDS drill fixture.
    将 SDS 钻头安装到 SDS 钻孔夹具中。

    i

    Two different lengths of drill guide bushings are provided to set the drill depth. These are placed over the end of the drill bit between the drill fixture and the drill collar. When the rotary hammer is attached to the end of the drill bit, the minimum distance from the bottom of the drill fixture bushing to the end of the drill bit should be no less than 4.25”.
    提供两种不同长度的钻孔导套来设置钻孔深度。这些被放置在钻头末端的钻头夹具和钻铤之间。当电锤连接到钻头末端时,从钻具衬套底部到钻头末端的最小距离应不小于 4.25”。

    i

    For each site, install a new SDS drill guide bushing into the drill fixture. Do not drill with a worn drill guide bushing.
    对于每个站点,在钻孔夹具中安装新的 SDS 钻孔导向衬套。请勿使用磨损的钻孔导套钻孔。

    Fig. 5: Setting up the drill and drill fixture
    图 5: 设置钻头和钻孔夹具
    Setting up the drill and drill fixture

    (1)

    Distance from the bottom of the drill guide to the end of the drill bit: at least 4.25”
    从钻头导轨底部到钻头末端的距离:至少 4.25 英寸

    (2)

    The drill fixture installed
    已安装钻具

  2. Turn the knob on the side of the rotary hammer to set the drill to the “hammer drill” position.
    转动电锤侧面的旋钮,将电钻设置到“锤钻”位置。

  3. Set the drill guide firmly over one of the holes in the floor template.
    将钻孔导板牢固地放在地板模板中的一个孔上。

    i

    Stand on the drill guide to keep it in position.
    站在钻孔导轨上以将其保持在适当的位置。

    Fig. 6: Proper drilling technique
    图 6: 正确的钻孔技术
    Proper drilling technique
  4. Drill the hole until the bushings hit bottom. Use a vacuum to remove the dust during the drilling operation.
    钻孔直到衬套触底。在钻孔作过程中使用真空吸尘器清除灰尘。

    i

    Avoid touching drill bit after each drilled hole
    避免在每个钻孔后接触钻头

    Drill bit will retain excessive heat from drilling
    钻头会保留钻孔产生的多余热量

    Avoid touching or laying bit on vinyl floor surface
    避免触摸或将钻头放在乙烯基地板表面

  5. Verify the depth of the hole using a 4” plastic screen.
    使用 4 英寸塑料筛网验证孔的深度。

    Fig. 7: 4” Screen flush fit to surface
    图 7: 4 英寸屏幕与表面齐平
    4” Screen flush fit to surface
    i

    The screen should bottom out such that the flange makes contact with the surface of the floor.
    筛网应触底,以便法兰与地板表面接触。

    Fig. 8: Installing Screen Inserts
    图片 8: 安装屏幕插件
    Installing Screen Inserts

    (1)

    Screen insert flush to floor surface
    筛网嵌件与地板表面齐平

    (2)

    Screen insert NOT flush to floor surface
    滤网插件未与地板表面齐平

  6. Repeat the drilling operation until all holes are drilled.
    重复钻孔作,直到钻完所有孔。

    i

    If rebar is encountered, mark the hole and move on to the next hole until every hole has been either fully drilled or marked for the rebar cutter.
    如果遇到钢筋,请标记孔并继续下一个孔,直到每个孔都已完全钻孔或已标记用于钢筋切割机。

  7. For holes containing rebar, use the drill fixture with the rebar guide bushing.
    对于包含钢筋的孔,请使用带有钢筋导向衬套的钻孔夹具。

    Fig. 9: Rebar cutter and concrete drill bit in their specific guide bushings
    图 9:钢筋切割机和混凝土钻头在其特定的导向衬套中
    Rebar cutter and concrete drill bit in their specific guide bushings

    (1)

    Rebar cutter  钢筋切割机

    (2)

    Rebar guide bushing (0.615” diameter)
    钢筋导向衬套(直径 0.615 英寸)

    (3)

    Concrete drill bit  混凝土钻头

    (4)

    Concrete guide bushing (0.563” diameter)
    混凝土导套(直径 0.563 英寸)

    Fig. 10: Rebar Bit  图片 10: 钢筋钻头 Rebar Bit
    i

    The rotary hammer drill must be set to the to the “drill only” mode when using the rebar cutter or the rebar cutter will be damaged. Also, as the rebar is cut, you must remove the resulting slugs from the cutter and the hole.
    使用钢筋切割机时,必须将电锤钻设置为“仅钻孔”模式,否则会损坏钢筋切割机。此外,在切割钢筋时,必须从切割器和孔中去除产生的废料。

  8. After all of the rebar has been successfully cut, switch back to the SDS drill guide fixture, set the hammer drill to “Hammer” mode and continue drilling the holes.
    成功切割所有钢筋后,切换回 SDS 钻孔导向装置,将锤钻设置为“锤击”模式并继续钻孔。

    i

    Ensure that all loose pieces of rebar have been removed from the holes before continuing with the concrete drill bit.
    在继续使用混凝土钻头之前,请确保已从孔中清除所有松散的钢筋。

2.1.3 Cleaning Up  2.1.3 清理

The holes must be cleaned thoroughly to obtain the required anchor bond strength.
必须彻底清洁孔以获得所需的锚固强度。

  1. Clean each hole using 3/4” drill brush, followed by vaccuming in and around hole using the micro-cleaning kit.
    使用 3/4 英寸钻刷清洁每个孔,然后使用微清洁套件在孔内和孔周围清洁。

    Fig. 11: Brush/drill combination
    图片 11: 刷子/钻头组合
    Brush/drill combination
  2. Run the brush/drill combination up and down in the hole to pull the dust out of the while continuously vacuuming the hole.
    在孔中上下运行刷子/钻头组合,将灰尘从孔中吸出,同时不断吸尘孔。

    Fig. 12: Cleaning the holes using the brush drill and the vacuum
    图片 12: 使用刷钻和真空吸尘器清洁孔
    Cleaning the holes using the brush drill and the vacuum
  3. With the micro-cleaning kit installed, vacuum up the dust that has accumulated in the bottom of the hole.
    安装微型清洁套件后,用吸尘器吸走积聚在孔底部的灰尘。

    Fig. 13: Cleaning the bottom of the drilled hole
    图片 13: 清洁钻孔底部
    Cleaning the bottom of the drilled hole
  4. Repeat the process until all the holes are clean.
    重复该过程,直到所有孔都干净为止。

2.2 Creating the Threaded Holes
2.2 创建螺纹孔

2.2.1 Installing the Threaded Rods
2.2.1 安装螺纹杆

  1. Place a 4” plastic screen into each hole.
    将 4 英寸塑料筛网放入每个孔中。

  2. Set the flange of the tube against the floor surface.
    将管子的法兰靠在地板表面。

    i

    Discard the insert in the top of the plastic tube before installing the tube.
    在安装管子之前,丢弃塑料管顶部的插件。

    Fig. 14: Installing the plastic screens
    图片 14: 安装塑料筛网
    Installing the plastic screens
  3. Load Hilti HY-150 concrete anchor adhesive into the adhesive gun according to the manufacturer's instructions.
    根据制造商的说明,将 Hilti HY-150 混凝土锚栓胶粘剂装入胶枪中。

    Fig. 15: Hilti concrete adhesive kit
    图片 15: 喜利得混凝土胶粘剂套件
    Hilti concrete adhesive kit

    (1)

    Cartridge  弹药筒

    (2)

    Gun  

    (3)

    Adhesive  胶粘剂

    i

    The dual-cylinder cartridge is self-opening, and the adhesive is dispensed through an auger-style nozzle that is attached to the cartridge manifold to ensure proper mixing of the components. Material from the first two “trigger pulls” (cycles) must be discarded to ensure that only properly mixed product is used.
    双圆筒卡式胶筒是自开式的,胶粘剂通过连接到卡式胶筒歧管的螺旋式喷嘴进行分配,以确保组件的正确混合。必须丢弃前两次“扳机拉动”(循环)的材料,以确保仅使用正确混合的产品。

    i

    Take note of Hliti expiration date, Do Not use if date is expired.
    记下 Hliti 到期日期,如果日期已过期,请勿使用。

    Fig. 16: Hilti Expiration Date
    图片 16: 喜利得有效期
    Hilti Expiration Date

    (1)

    Hilti Expiration Date Location
    Hilti Expiration Date 位置

    Fig. 17: Expiration Date for Hilti Package
    图片 17: 喜利得套餐的到期日期
    Expiration Date for Hilti Package

    (1)

    Hilti Expiration Date  Hilti 有效期

  4. Place the tip of the nozzle at the bottom of the hole.
    将喷嘴的尖端放在孔的底部。

  5. Squeeze the trigger while gradually raising the nozzle.
    在逐渐抬起喷嘴的同时扣动扳机。

    i

    Fill the hole from the bottom up to prevent air from being trapped within the hole. Approximately three cycles worth of adhesive are needed to fill the hole. Do not fill more than one hole at a time.
    从下往上填充孔,以防止空气滞留在孔内。大约需要三个循环的粘合剂来填充孔。不要一次填充多个孔。

    Fig. 18: Filling a hole with Hilti adhesive
    图片 18: 用喜利得胶粘剂填充孔
    Filling a hole with Hilti adhesive
  6. Screw a threaded rod into the hole until the rod bottoms out.
    将螺纹杆拧入孔中,直到杆触底。

    i

    You must rotate the rods during the insertion so that the adhesive distributes around all of the threads. If a sufficient amount of adhesive is present, it will squeeze out of the top of the hole. If not, remove the rod and add more adhesive.
    在插入过程中,您必须旋转杆,以便粘合剂分布在所有螺纹周围。如果存在足够量的粘合剂,它会从孔的顶部挤出。如果没有,请取下杆并添加更多粘合剂。

    i

    Load additional packages of concrete adhesive one at a time as needed. Each package should fill 8 to 10 holes.
    根据需要,一次装入一包额外的混凝土胶粘剂。每个包装应填充 8 到 10 个孔。

    Fig. 19: Installing a threaded rod
    图片 19: 安装螺纹杆
    Installing a threaded rod
  7. Thoroughly wipe excess adhesive from around the rod and off of the template with paper towels or disposable wipes.
    用纸巾或一次性湿巾彻底擦去杆周围和模板上多余的胶粘剂。

    Fig. 20: Wiping away the excess adhesive
    图片 20: 擦去多余的胶粘剂
    Wiping away the excess adhesive
  8. Place a plastic alignment bushing (also referred to as a “top hat”) over the threaded rod, making sure that it is flush with template surface.
    将塑料对齐衬套(也称为“顶帽”)放在螺纹杆上,确保它与模板表面齐平。

    Fig. 21: Alignment bushings installed
    图 21: 安装的对准衬套
    Alignment bushings installed
    i

    The bushing (top hat) ensures that the rod is vertically aligned as the adhesive cures. The adhesive takes approximately 6 minutes to dry and 6 hours to cure.
    衬套(顶帽)确保在胶粘剂固化时杆垂直对齐。胶粘剂大约需要 6 分钟才能干燥,大约需要 6 小时才能固化。

  9. Repeat the procedure until all rods and bushings have been installed for each hole.
    重复该过程,直到每个孔都安装了所有杆和衬套。

    Fig. 22: The rods and bushings installed
    图片 22: 安装的杆和衬套
    The rods and bushings installed

2.2.2 Removing the Threaded Rods
2.2.2 卸下螺纹杆

  1. After the concrete adhesive has thoroughly cured, remove the alignment bushings (top hat) from the template.
    混凝土胶粘剂彻底固化后,从模板上拆下对准衬套(顶帽)。

  2. Remove the threaded rods from the mounting holes: Use a drill and stud extraction bit to first slowly back a rod out of its respective mounting hole by two or three turns, then carefully back the rod completely out of the hole.
    从安装孔中取出螺纹杆:使用钻头和螺柱拔出钻头,首先将杆缓慢地从各自的安装孔中回退两到三圈,然后小心地将杆完全从孔中回出。

    i

    For best torque and to avoid excessive wear on the drill, use the specified power drill and not a portable version. Make sure the drill is set to reverse.
    为了获得最佳扭矩并避免钻头过度磨损,请使用指定的电钻,而不是便携式版本。确保将 drill 设置为 reverse。

    i

    The hole threads may be damaged if the rod wobbles too violently during extraction.
    如果杆在提取过程中摆动得太剧烈,孔螺纹可能会损坏。

    Avoid excessive drill speeds when removing the rods.
    拆卸杆时避免过快的钻孔速度。

    Fig. 23: Removing the threaded rods
    图片 23: 移除螺纹杆
    Removing the threaded rods
  3. After all of the threaded rods have been removed, unfasten all segments of the template, by removing screws which holds template brackets.
    卸下所有螺纹杆后,卸下固定模板支架的螺钉,以解开模板的所有部分。

  4. Remove all tapcon screws from template segments.
    从模板段上拆下所有 tapcon 螺钉。

  5. Carefully slide the templates off the steel guide pins and away from the work area. Do not bend the steel guide pins.
    小心地将模板从钢制导销上滑出工作区域。不要弯曲钢制导销。

  6. Clean the alignment bushings (top hat) and floor templates thoroughly with Simple Green before storing them for the next system installation.
    在存放用于下一次系统安装之前,用 Simple Green 彻底清洁对齐衬套(顶帽)和地板模板。

2.3 Scraping the Floor  2.3 刮地板

  1. Remove the polycoated paper and use the razor blade floor scraper to cut the flange off of each plastic screen tube.
    取下涂布纸,用剃须刀片地板刮刀切下每个塑料筛管的法兰。

    Fig. 24: Scraping the area around the jackscrew holes
    图片 24: 刮擦顶螺丝孔周围的区域
    Scraping the area around the jackscrew holes
  2. Scrape the area around each hole to remove excess adhesive from the floor.
    刮擦每个孔周围的区域,去除地板上多余的粘合剂。

    i

    There should be no protrusions above the floor surface upon completion.
    完成后,地板表面上方不应有突起。

  3. Clean the holes using vacuum with a plastic tube from a Hilti pack.
    使用 Hilti 包装中的塑料管使用真空清洁孔。

  4. Thoroughly vacuum the entire floor area.
    彻底吸尘整个地板区域。

2.4 Creating the Bed Platform
2.4 创建 Bed 平台

i

If the PHS jackscrews are moved or bumped in any way, they must be reverified that they are still level using the triangular block and two precision levels.
如果 PHS 顶丝杠以任何方式移动或碰撞,则必须使用三角形块和两个精度水平仪重新验证它们是否仍然水平。

After the PHS jackscrews are adjusted, extreme care must be used to not step, kick, or run over them with the PHS mover casters, and so forth.
调整 PHS 顶丝后,必须格外小心,不要用 PHS 移动脚轮等踩踏、踢或碾过它们。

2.4.1 Installing the First Four PHS Jackscrews
2.4.1 安装前四个 PHS 顶丝

i

The rows of jackscrews in this section are defined as being on the right or left; orientation is based on facing the scanner from the PHS.
本节中的螺钉行定义为位于右侧或左侧;方向基于从 PHS 面向扫描仪。

  1. Ensure each hole has been vaccumed before inserting the jackscrews.
    在插入顶丝之前,确保每个孔都已真空。

  2. Starting at the end farthest from the scanner, install 4 jackscrews in the first 2 holes on the right and left row. The jackscrews must be started manually.
    从距离扫描仪最远的一端开始,在左右两排的前 2 个孔中安装 4 个顶丝杠。必须手动启动顶丝。

    i

    Be careful not to cross-thread the jackscrews during installation.
    安装过程中小心不要使顶丝螺钉交叉。

    Use two hands to keep the jackscrews orthogonal.
    用两只手保持顶丝正交。

    Fig. 25: Jackscrews must be started manually
    图片 25: 顶丝必须手动启动
    Jackscrews must be started manually
  3. For each jackscrew, place a 3/16” spacer (such as a 3/16” allen wrench) onto the floor next to the jackscrew.
    对于每个顶丝,将一个 3/16 英寸垫片(例如 3/16 英寸内六角扳手)放在顶丝旁边的地板上。

    Fig. 26:   图 26: TRA1PR8X-160707-00-03.gif
  4. After the jackscrews are manually started, use the battery powered drill to screw down the jackscrews.
    手动启动顶丝后,使用电池供电的电钻拧紧顶丝。

    Fig. 27: Using a guide to create an approximate 3/16” gap between the disc and the floor
    图片 27: 使用导板在圆盘和地板之间创建大约 3/16 英寸的间隙
    Using a guide to create an approximate 3/16” gap between the disc and the floor

    (1)

    Guide  指导

    (2)

    Deep-well socket  深孔插座

    Fig. 28: Installing Jackscrews
    图片 28: 安装顶升螺钉
    Installing Jackscrews
    i

    The precision bubble level and the triangular gauge block are expensive, high-precision components that must be kept clean. Also, keep all measuring surfaces clean.
    精密气泡水平仪和三角形量块是昂贵的高精度部件,必须保持清洁。此外,保持所有测量表面清洁。

    Do not place the bubble level and triangular gauge block on the floor. Place them on a clean cloth or other protective surface when not in use.
    请勿将气泡水平仪和三角量块放在地板上。不使用时,将它们放在干净的布或其他保护表面上。

    Fig. 29: Preparing to level the first four jackscrews
    图片 29: 准备调平前四个顶丝杠
    Preparing to level the first four jackscrews

    (1)

    Reference jackscrew  参考顶丝

    (2)

    Precision bubble level (two required)
    精密气泡水平仪(需要两个)

    (3)

    Triangular gauge block  三角量块

  5. Facing toward the gantry, place the triangular gauge block on three of the jackscrews with the long side of the triangle oriented along the right row.
    面向龙门架,将三角形量块放在三个顶丝上,三角形的长边沿右行方向。

    Fig. 30: Place the long side of the triangular block on the right side row of the jackscrews (facing the gantries)
    图片 30: 将三角形块的长边放在顶丝杠的右侧行 (面向龙门架)
    Place the long side of the triangular block on the right side row of the jackscrews (facing the gantries)
    i

    Check the precision bubble level for calibration before use.
    使用前检查精密气泡水平仪进行校准。

    Verify that the level gives the same indication when the level is rotated 180 degrees on the long axis. If the level is not the same when rotated, then the level should be removed from use until it is recalibrated.
    验证当水平仪在长轴上旋转 180 度时,水平仪是否给出相同的指示。如果旋转时液位不同,则应停止使用该液位,直到重新校准。

    i

    The calibration of the precision bubble levels will need to be verified before the leveling process is complete. In order to verify the calibration of the levels, a surface which is level enough to float the bubble on the precision level will be needed. If possible, verify the calibration now by first placing one level on one of the triangular gauge block and note the position of the bubble. Rotate the level 180˚ and note the position of the bubble. The position should be the same in both cases. If the bubble is at a different position after the rotation, the level is out of calibration. Repeat the verification for each level in use at this time.
    在矫平过程完成之前,需要验证精密气泡水平仪的校准。为了验证水平仪的校准,需要一个足够水平的表面,以使气泡漂浮在精密水平仪上。如果可能,现在验证校准,首先将一个水平仪放在其中一个三角形量规块上,并记下气泡的位置。将水平仪旋转 180° 并注意气泡的位置。在这两种情况下,位置应相同。如果气泡在旋转后位于不同的位置,则水平超出校准范围。对此时使用的每个级别重复验证。

    i

    If level is out-of-calibration refer to Appendix D for calibration procedure before continuing.
    如果液位超出校准范围,请在继续之前参考附录 D 了解校准程序。

  6. Place two precision bubble levels between the dots on the triangular gauge block.
    在三角形量规块上的点之间放置两个精密气泡水平仪。

    Fig. 31: Two precision bubble levels placed along the edges of the triangular block
    图片 31: 沿三角形块边缘放置的两个精密气泡水平仪
    Two precision bubble levels placed along the edges of the triangular block
  7. The levels have two bubbles. Orient the long bubble of one level to measure along the right row of jackscrews. Orient the long bubble of the other level to measure leveling between the two rows.
    级别有两个气泡。将长气泡定向一层,以沿右行顶丝杠进行测量。确定另一个层级的长气泡的方向,以测量两行之间的调平。

    Fig. 32: Leveling Jackscrews with precision triangle block
    图片 32: 使用精密三角形块调平顶丝杠
    Leveling Jackscrews with precision triangle block
    Fig. 33: Leveling Precision Triangle Block on Jackscrews
    图片 33: 顶丝杠上的调平精密三角形块
    Leveling Precision Triangle Block on Jackscrews
    i

    Never adjust the reference jackscrew (jackscrew at right angle of triangular guage block.
    切勿调整参考顶丝(顶丝在三角量块的直角处。

    When using the precision bubble level, keep the “short” bubble (transvere bubble) in the middle; otherwise, the reading is inaccurate.
    使用精密气泡水平仪时,将“短”气泡(transvere bubble)保持在中间;否则,读数不准确。

2.4.1.1 Locating the Hole at the Highest Floor Elevation
2.4.1.1 将孔定位在最高楼层标高处

Fig. 34: Finding Floor High Spot
图片 34: 寻找地板高点
Finding Floor High Spot

(1)

Angle Block with Scale Ruler
带刻度尺的角度块

(2)

Pinpoint Laser  针点激光

(3)

Triangular Guage Block  三角量块

  1. After the fourth jackscrew has been leveled, move the triangular gauge block back to its original position (right side) and place the pinpoint laser on the gauge block.
    第四个顶丝调平后,将三角形量块移回其原始位置(右侧),并将精确激光放在量块上。

  2. Point the laser down the right row of holes.
    将激光对准右行孔。

  3. Tape an engineer's pocket scale to a right angle block (this keeps the scale perpendicular to the floor).
    将工程师的袖珍秤贴在一个直角块上(这样可以保持秤垂直于地板)。

    Fig. 35: Angle Block with Scale Ruler
    图片 35: 带刻度尺的角块
    Angle Block with Scale Ruler
  4. Use the scale to measure the distance from the floor to the laser beam at each hole location.
    使用刻度测量每个孔位置从地板到激光束的距离。

  5. With the zero end of the scale against the floor, read the scale at the top of the laser dot.
    将刻度的零端靠在地板上,读取激光点顶部的刻度。

  6. Record each measurement and the location of each hole in the right row.
    在右行中记录每个测量值和每个孔的位置。

  7. Reposition the triangular gauge block and the pinpoint laser so that it points down the left row of holes. Record each measurement and the location of each hole in the left row.
    重新定位三角形量规块和精确激光,使其指向左行孔。在左行中记录每个测量值和每个孔的位置。

    Next, you will determine the highest elevation in the floor. It is the location with the smallest measurement.
    接下来,您将确定楼板中的最高高程。它是测量值最小的位置。

  8. Place a piece of tape next to this hole to mark the location. This hole will become the new reference jackscrew.
    在这个孔旁边放一条胶带来标记位置。这个孔将成为新的参考千斤顶。

    Fig. 36: Setting new reference height for floor high spot
    图片 36: 为地板高点设定新的参考高度
    Setting new reference height for floor high spot
  9. Loosen the lock-down discs on the four jackscrews. These jackscrews may need to be readjusted in the next section.
    松开四个千斤顶螺钉上的锁定盘。这些顶丝杠可能需要在下一节中重新调整。

  10. Remove the laser and triangular gauge block.
    拆下激光器和三角形量块。

Leveling the PHS Jackscrews
调平 PHS 顶丝
  1. Install the remaining PHS jackscrews.
    安装剩余的 PHS 顶丝杠。

    i

    Jackscrews must be started manually and not cross-threaded.
    顶丝必须手动启动,而不是交叉螺纹。

  2. At the hole location that is marked with tape (the highest elevation, the new reference jackscrew), place a 3/16” dowel pin on the floor, underneath the lock-down disc.
    在用胶带标记的孔位置(最高高度,新的参考顶丝),将一个 3/16 英寸的定位销放在地板上,位于锁定盘下方。

  3. With the lock-down disc in contact with the bottom of the hex nut, adjust the height of the jackscrew to meet the dowel pin, thus creating a 3/16” gap between the bottom of the disc and the floor.
    当锁定盘与六角螺母的底部接触时,调整顶丝杠的高度以与定位销相接,从而在圆盘底部和地板之间形成 3/16 英寸的间隙。

    Fig. 37: Setting a 3/16” gap between the floor and the jackscrew
    图片 37: 在地板和顶丝之间设置 3/16“ 的间隙
    Setting a 3/16” gap between the floor and the jackscrew

    (1)

    The starting jackscrew  起动顶丝杠

    (2)

    3/16” dowel  3/16“ 销钉

  4. Place the triangular gauge block on the new reference jackscrew with the 90-degree angle positioned on the new reference jackscrew.
    将三角形量块放在新的参考顶丝上,90 度角位于新的参考顶丝上。

  5. Level all of the jackscrews with respect to the new reference jackscrew.
    将所有顶丝杠相对于新的参考顶丝杠调平。

    i

    Keep the levels in the exact same orientation during the entire leveling process.
    在整个调平过程中,保持水平仪处于完全相同的方向。

  6. Position the lock-down disc of each jackscrew against the floor after adjustment.
    调整后,将每个顶丝的锁定盘靠在地板上。

  7. Advance the triangular gauge block down the line one pair of bolts at a time.
    将三角形量规块沿线向下推进,一次一对螺栓。

    i

    Always keep the 90-degree angle of the triangle on a jackscrew that has already been adjusted.
    始终将三角形的 90 度角保持在已经调整的顶丝杠上。

  8. Verify the level in each direction by positioning the levels on the long and short sides of the gauge block.
    通过将水平定位在量规块的长边和短边上来验证每个方向的水平。

Leveling the PET Gantry Jackscrews
调平 PET 龙门式顶丝

After the PHS jackscrews have been leveled, the PET gantry jackscrews must be leveled.
将 PHS 顶丝杠调平后,必须对 PET 龙门式顶丝杠进行调平。

  1. Place the two rectangular precision gauge blocks on both sides of the gantry, nearest the PHS.
    将两个矩形精密量块放在龙门架的两侧,最靠近 PHS。

    Fig. 38: Leveling the PET gantry jackscrews
    图片 38: 调平 PET 龙门式顶丝
    Leveling the PET gantry jackscrews

    (1)

    The rectangular precision gauge blocks
    矩形精密量块

    (2)

    Measuring the height of the jackscrew
    测量顶丝杆的高度

    (3)

    The triangular precision gauge block for the PHS
    用于 PHS 的三角形精密量块

    i

    The top of PET gantry jackscrew 7/8” bolt must be at least 1” off the floor.
    PET 龙门式顶丝 7/8 英寸螺栓的顶部必须至少离地面 1 英寸。

    Fig. 39: Ensuring that the PET gantry jackscrews are 1” from the floor
    图片 39: 确保 PET 龙门式顶丝杠距离地面 1 吋
    Ensuring that the PET gantry jackscrews are 1” from the floor
  2. Place a precision bubble level on a rectangular gauge block and level the two associated jackscrews.
    将精密气泡水平仪放在矩形测量块上,并调平两个相关的顶丝。

    Fig. 40: Leveling Jackscrews for PET Gantry
    图片 40: PET 龙门架的调平顶丝杠
    Leveling Jackscrews for PET Gantry
Determining the Highest Elevation
确定最高海拔

You will use the pinpoint laser and receiver to determine which side of the PET gantry jackscrews has the highest elevation.
您将使用精确激光和接收器来确定 PET 龙门式顶丝杠的哪一侧具有最高的高度。

  1. Establish a reference by placing the triangular gauge block on the three PHS jackscrews nearest the top of the gantry so that the 90-degree angle is positioned toward the gantry.
    通过将三角形量块放在最靠近龙门架顶部的三个 PHS 顶丝杠上来建立参考,使 90 度角朝向龙门架。

  2. Place the pinpoint laser on the triangular gauge block and place the laser receiver on one of the rectangular gauge blocks.
    将精确激光放在三角形量块上,并将激光接收器放在其中一个矩形量块上。

    Fig. 41: Determining which side of the PET gantry has the highest elevation
    图片 41: 确定 PET 机架的哪一侧具有最高的高度
    Determining which side of the PET gantry has the highest elevation

    (1)

    The rectangular precision gauge block with the laser receiver on top
    顶部带有激光接收器的矩形精密量块

    (2)

    Leveling the PET gantry jackscrews
    调平 PET 龙门式顶丝杠

    (3)

    The triangular precision gauge block with the laser level on top
    顶部带有激光水平仪的三角形精密量块

    Fig. 42: Finding high side for PET gantry Jackscrews
    图片 42: 寻找 PET 龙门式顶丝杠的高侧
    Finding high side for PET gantry Jackscrews
  3. Determine the height level of each of the rectangular gauge blocks. The highest elevation is the side with the lowest reading.
    确定每个矩形量块的高度标高。最高高程是读数最低的一侧。

    i

    For example, if the reading on the left gauge block is 1.400 and the reading on the right gauge block is 1.200, then the right gauge block is 0.200 higher than the left. Therefore, the left jackscrews should be adjusted to raise the gauge block by 0.200. The difference between each block should be no more than 0.003.
    例如,如果左侧量块上的读数为 1.400,右侧量块上的读数为 1.200,则右侧量块比左侧量块高 0.200。因此,应调整左顶丝杠,将量块升高 0.200。每个区块之间的差值应不超过 0.003。

    i

    For consistency, keep the bubble levels in the same orientation throughout the following process.
    为了保持一致性,在接下来的过程中,请保持气泡水平仪处于相同的方向。

  4. Raise and re-level the low side of the PET gantry jackscrews so that they match in elevation to the high side.
    升高并重新调平 PET 龙门式顶丝杠的低侧,使其在高度上与高侧匹配。

  5. Verify the height by moving the pinpoint receiver from side to side, and adjust until the height matches. When this condition is met, you can level the remainder of the jackscrews in each row relative to the starting jackscrew.
    通过将精确接收器从一侧移动到另一侧来验证高度,并进行调整直到高度匹配。满足此条件时,您可以相对于起始顶丝杠调平每排中的其余顶丝杠。

  6. Position the lock-down disc of each jackscrew against the floor after adjustment.
    调整后,将每个顶丝的锁定盘靠在地板上。

Installing CT Shoes and Blocks
安装 CT 靴和滑块
i

If mounting shoes onto a vinyl type of floor--the vinyl must be cut where the shoes will be place, see the following steps:
如果将鞋子安装到乙烯基类型的地板上 - 必须在放置鞋子的位置切割乙烯基,请参阅以下步骤:

  1. Draw around the shoe edges to create an outline for cutting away the floor vinyl, but expanding the outline by approximately 1/4 in (6.4 mm) around the perimeter to allow for later positioning of the CTblocks. 40.
    在鞋子边缘周围绘制,创建一个用于切割地板乙烯基的轮廓,但将轮廓在周边扩大约 1/4 英寸(6.4 毫米),以便稍后定位 CTblocks。40.

  2. Remove the shoes and then carefully use a hammer and scrapper to remove the floor covering within the outlines.
    脱掉鞋子,然后小心地用锤子和刮刀去除轮廓内的地板覆盖物。

    i

    Avoid damaging the threaded holes
    避免损坏螺纹孔

  3. Vacuum the holes to remove all debris.
    用吸尘器吸尘孔以清除所有碎屑。

  4. Align the through-holes of the 4 shoe and block combinations so that they are centered as concentrically as possible with their corresponding threaded holes in the floor
    对齐 4 个靴和块组合的通孔,使它们尽可能与地板上相应的螺纹孔同心

  5. Installing CT shoes to the floor.
    将 CT 鞋安装到地板上。

  6. Align the holes in the shoe over the threaded holes in the floor.
    将鞋子上的孔与地板上的螺纹孔对齐。

  7. Use metal shoe as a template to draw an outline of the shoe shape to cut out vinyl material where the blocks will be installed.
    以金属鞋为模板,画出鞋形的轮廓,剪出将安装积木的乙烯基材料。

  8. Carefully remove all unwanted vinyl material and any ahedsive from the cut out area and replace metal shoe.
    小心地从切口区域去除所有不需要的乙烯基材料和任何 ahedive,然后更换金属鞋。

  9. Align the mounting holes in the blocks with the holes in shoe. Secure the blocks and shoes snugly into place using one each 1/2-13 x 6” hex-head screw and one each #1/2 large-OD case hardened washer per bolt hole location.
    将块中的安装孔与靴中的孔对齐。在每个螺栓孔位置,使用一个 1/2-13 x 6“ 六角头螺钉和一个 #1/2 大外径表面硬化垫圈将块和靴紧贴到位。

  10. Secure the blocks tightly in place with one 3/4-13 x 4” hex-head screw and one #1/2 large-OD case hardened washer:
    用一个 3/4-13 x 4“ 六角头螺钉和一个 #1/2 大外径表面硬化垫圈将块牢固地固定到位:

Finding CT Block Height  查找 CT 块高度
  1. Attach the pinpoint receiver to the T-bar included in the pinpoint laser kit and place it on the highest block.
    将精确接收器连接到精确激光套件中包含的 T 型杆上,并将其放置在最高的块上。

    Fig. 43: Assembling Laser Receiver to T-Bar
    图片 43: 将激光接收器组装到 T 型杆上
    Assembling Laser Receiver to T-Bar

    (1)

    T-Bar  T 型杆

    (2)

    Laser Receiver  激光接收器

  2. Adjust the receiver so that the display reads zero as measured on the mounting block that has the high spot.
    调整接收器,使显示屏在具有高点的安装块上测量时读数为零。

    Fig. 44: Laser Receiver set to Zero
    图片 44: 激光接收器设定为零
    Laser Receiver set to Zero
  3. Similar to finding the highest floor location previously, tape an engineer’s pocket ruler scale to a right-angle block (keeping the ruler perpendicular to the block).
    与之前查找最高楼层位置类似,将工程师的袖珍标尺刻度贴到直角块上(保持标尺垂直于块)。

  4. Use the ruler scale and pinpoint laser to measure the distance from the base of the block to the laser beam.
    使用尺尺刻度和精确激光测量从块底部到激光束的距离。

  5. Move the laser receiver to the three other mounting blocks to measure the height delta and record the values in the "laser height reading" column in Table 1.
    将激光接收器移动到其他三个安装块上,以测量高度增量,并记录表 1 中“激光高度读数”列中的值。

    Fig. 45: Positions of the CT mounting blocks
    图片 45: CT 安装块的位置
    Positions of the CT mounting blocks

    (1)

    Left rear mounting block  左后安装块

    (2)

    Left front mounting block
    左前安装块

  6. Record the values for each block in the "scale ruler value" column in Table 1.
    在表 1 的 “scale ruler value” 列中记录每个块的值。

  7. Identify which mounting block is on the high spot of the floor (lowest scale value).
    确定哪个安装块位于地板的高点(最低刻度值)。

  8. Adjust the receiver so that the display reads zero as measured on the mounting block that had the high spot.
    调整接收器,使显示屏在具有高点的安装块上测量时读数为零。

    Tab. 3: High Spot Calculation
    表 3:高点计算

    Block  

    Scale Ruler Values  缩放标尺值

    C-Bore Depth  C 孔深度

    Laser Height Reading  激光高度读数

    Target Gap  目标间隙

    Delta Height Offset  增量高度偏移

    Left Front  左前

    0.08”

    Left Rear  左后

    0.08”

    Right Front  右前

    0.08”

    Right Rear  右后方

    0.08”

  9. Move the laser receiver to the three other mounting blocks, measure the deltas and record the values in the "laser height reading" column in Table 1 High Spot Calculation.
    将激光接收器移动到其他三个安装块上,测量增量并记录表 1 高光点计算的“激光高度读数”列中的值。

  10. When the measurements are completed and recorded, the pinpoint laser and accessories are no longer needed. Properly store them away for future use.
    完成并记录测量后,不再需要精确激光和附件。妥善存放以备将来使用。

  11. Set the digital depth micrometer to zero using the right-angle block as a reference.
    使用直角块作为参考,将数字深度千分尺设置为零。

  12. Measure the counter-bore depth (C-bore depth) for the leveling foot of each upper mounting block.
    测量每个上部安装块的调平脚的沉孔深度(C 孔深度)。

    Fig. 46: Measuring the counter-bore depth
    图片 46: 测量沉孔深度
    Measuring the counter-bore depth
  13. Record the value in the "C-Bore Depth" column in Table 1 High Spot Calculation.
    在表 1 高点计算的“C 孔深度”列中记录该值。

  14. Calculate the offset for each CT foot compared to the high spot foot.
    计算每个 CT 脚与高点脚相比的偏移量。

  15. Before setting the CT in place, use the digital depth micrometer to pre-adjust the CT leveling feet to the corresponding "delta offset" values recorded in Table 1High Spot Calculation .
    在设置 CT 之前,使用数字深度千分尺将 CT 调平英尺预先调整到表 1 高点计算中记录的相应“增量偏移”值。

    i

    The offset is from the bottom of the CT leveling foot to bottom surface of the CT frame.
    偏移量是从 CT 调平脚的底部到 CT 框架的底面。

    Fig. 47: Measuring the digital depth
    图片 47: 测量数字深度
    Measuring the digital depth
  16. Calculate the high spot offset for each block by adding the three values from the "laser reading," C-bore depth, and "target gap" columns. The total will be recorded in the "delta offset" column.
    通过将 “laser reading”(激光读数)、C 孔深度和 “target gap”(目标间隙)列中的三个值相加,计算每个块的高光斑偏移。总数将记录在 “delta offset” 列中。

    To illustrate calculation of the high spot and the offset, see table 2 for example:
    为了说明高点和偏移量的计算,请参见表 2 中的示例:

    • Assume ruler readings for the scale dimension of LF=1.50, LR=1.90, RF=1.75, and RR=1.85.
      假设刻度尺寸的标尺读数为 LF=1.50、LR=1.90、RF=1.75 和 RR=1.85。

    • Assume C-bore depths of LF=.255, LR=.251, RF=.260, and RR=.267.
      假设 C 孔深度为 LF=.255、LR=.251、RF=.260 和 RR=.267。

    • Enter laser readings (zeroed on the lowest scale dimension of 1.50) of LF=0.000, LR=0.051, RF=0.027, and RR=0.037.
      输入 LF=0.000、LR=0.051、RF=0.027 和 RR=0.037 的激光读数(在最低刻度尺寸 1.50 上归零)。

    Using those values, the results appear as in Table 2 .
    使用这些值,结果如 表 2 所示。

    Tab. 4: Example High Spot Calculation
    表 4:高点计算示例

    Block  

    Scale Dimension  缩放维度

    C-Bore Depth  C 孔深度

    Laser Reading  激光读数

    Target Gap  目标间隙

    Delta Offset  增量偏移

    Left Front  左前

    1.50

    0.255

    0.000

    0.08”

    0.335

    Left Rear  左后

    1.90

    0.251

    0.051

    0.08”

    0.382

    Right Front  右前

    1.75

    0.260

    0.027

    0.08”

    0.367

    Right Rear  右后方

    1.85

    0.267

    0.037

    0.08”

    0.384

  17. Calculate the deltas and complete Table 1 High Spot Calculation.
    计算增量并完成表 1 高点计算。

    DELTA OFFSET = C-BORE + LASER + TARGET GAP
    DELTA 偏移 = C 孔 + 激光 + 目标间隙

    LF: 0.255î + 0.000î +.080î = .335î
    低频: 0.255î + 0.000î +.080î = .335î

    Later in the process and before setting the CT in place, the CT leveling feet will be pre-adjusted to the actual corresponding "delta offset" values using the digital depth micrometer. The offset is from the bottom of the CT leveling foot to the bottom surface of the CT frame.
    在过程的后期,在将 CT 设置到位之前,将使用数字深度千分尺将 CT 调平脚预先调整到实际相应的“增量偏移”值。偏移量是从 CT 调平脚的底部到 CT 框架的底面。